User contributions
- 14:41, 14 March 2018 (diff | hist) N BREEAM Evidence referencing (Created page with "BREEAM Good practice (efficient!) evidence referencing = Aim and benefits = Clear evidence aids both the assessor in writing up the report and the QA auditor in reviewing the e...")
- 11:44, 18 January 2018 (diff | hist) N BREEAM Protection of ecological features (Created page with "BREEAM Protection of ecological features = Aim and benefits = To protect existing ecological features from substantial damage during site preparation and completion of construc...")
- 11:17, 18 January 2018 (diff | hist) BREEAM Hard landscaping and boundary protection
- 11:17, 18 January 2018 (diff | hist) BREEAM Site Selection
- 11:16, 18 January 2018 (diff | hist) BREEAM Visual comfort View out
- 11:16, 18 January 2018 (diff | hist) Common contractor errors
- 11:15, 18 January 2018 (diff | hist) BREEAM Cyclist Facilities
- 11:15, 18 January 2018 (diff | hist) BREEAM Ecological value of site
- 11:10, 18 January 2018 (diff | hist) N BREEAM Ecological value of site (Created page with "BREEAM Ecological value of site = Aim and benefits = To encourage development on land that already has limited value to wildlife and to protect existing ecological features fro...")
- 14:49, 4 January 2018 (diff | hist) N BREEAM Hard landscaping and boundary protection (Created page with "BREEAM Hard landscaping and boundary protection = Aim and benefits = To recognise and encourage the specification of materials for boundary protection and external hard surfac...")
- 14:13, 4 January 2018 (diff | hist) N BREEAM Site Selection (Created page with "BREEAM Site Selection = Aim and benefits = To encourage the reuse of land that has been previously developed and discourage the use of previously undeveloped land for building....")
- 16:21, 13 December 2017 (diff | hist) N BREEAM Visual comfort View out (Created page with "= Aim and benefits = To allow occupants to refocus their eyes from close work and enjoy an external view, thus reducing the risk of eyestrain and breaking the monotony of the in...")
- 09:32, 5 December 2017 (diff | hist) N Common contractor errors (Created page with "= Aim and benefits = Highlights things which can trip contractors up or slip their minds. = When to consider = When approaching construction. Run through the requirements of t...")
- 15:31, 4 December 2017 (diff | hist) BREEAM Cyclist Facilities
- 15:24, 4 December 2017 (diff | hist) N BREEAM Cyclist Facilities (Created page with "Aim and benefits Aim is to encourage building users to cycle by ensuring adequate provision of cyclist facilities. Building users are more likely to use their bikes when safe, ...")
Featured articles and news
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.






















