Panel procedure
Capital Works Management Framework, Guidance Note, Glossary, Published by the Government of Ireland Department of Finance in 2009 suggests that: ‘The panel procedure is one that may be used by the Contracting Authority for the procurement of a specialist works contractor. A panel of specialists is proposed by the Contracting Authority, and the main contract tenderers can then choose to use a panel specialist or propose an alternative specialist with their tender submission. Any applicant for the panel of specialist works contractors may express an interest in being included on a panel in the main contract tender invitation; but only those that qualify are placed on the panel.’
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Social distancing goes high tech
Tech tools to help manage people and space post-pandemic.
Eclectic Edwardian architecture
A style that ranges from mock Tudor to arts and crafts to the 'Wrenaissance'.
Free guide from Secured by Design.
Building Back Better: Circularity
BREEAM strategy for sustainability and the circular economy.
Free tool to improve the construction programming process.
Building services verification
Are buildings doing what they're supposed to be doing?
Cities with quick access to everything by foot or bike.
The pressures and pinch points of global destinations.
The green economic recovery beyond COVID-19
Making the case for a sustainable future.
Building Conservation Certification Scheme expands eligibility
Retrofit professionals now entitled to enter CIOB programme.
Unlimited Potential report looks at gender and racial bias
How, where, when and why stereotypes happen.
Optimising the best features of both energy performance tools.
The project information process
BSRIA guidance updated in BG 78/2021 publication.
ISO standard supports crime prevention through environmental design.