Manufacture of lightweight aggregate granules containing phase change materials
Manufacture of lightweight aggregate granules containing phase change materials, by Ahmad Wadee; Nick McCullen; Pete Walker; Veronica Ferrandiz-Mas, University of Bath, Department of Architecture and Civil Engineering.
Phase Change Materials (PCMs) can reduce the energy requirements of a building by reducing peak demand for either summer cooling or winter heating. PCMs also have the potential of reducing the amount of energy lost and increasing thermal comfort in buildings, by buffering temperature fluctuations. This research explores more efficient ways to host PCMs and further develop new methods of encapsulating PCMs and incorporating them into the built environment.
The following conclusions can be drawn from the results obtained thus far:
- Vacuum impregnation is a more effective method of absorbing the PCM into the lightweight aggregates (LWA) than immersion.
- The optimum impregnation ratio using a aerated concrete LWA and a temperature of 40°C is 1.3.
- The viscosity of the PCM influences the amount of PCM absorbed, although at lower temperature the effect is less significant.
- The time allowed for absorption influences the amount of PCM absorbed.
Find out more: https://www.bretrust.org.uk/phd/ahmad-wadee/
Contact: Ahmad Wadee, University of Bath, bath.ac.uk aw2060@bath.ac.uk.
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.
Construction Management, 10 June.
Heat pumps beat boilers in new home tests.