Lock-in risk assessment
The RIBA Passivhaus Overlay, published by the RIBA in 2022, states in relation to the lock-in risk assessment: “Lock-in occurs when infrastructure, technology and product design choices are responsible for avoidable GHG emissions. In this context the term refers to moderate improvements in energy efficiency which are undertaken on retrofit projects. Once such measures have been undertaken it becomes unsustainable, uneconomical and impractical to change the building, leading to substandard performance for at least 30 or 40 years. To avoid lock-in the standard of energy efficiency achieved by each measure must be future-proof. A lock-in risk assessment considers a range of scenarios, the construction sequence, phasing, maintenance plans and financial planning, and seeks to achieve the best possible outcome over the lifecycle of the building. Sometimes it may be more beneficial to postpone a measure, so that it may be undertaken properly later, rather than using a moderate improvement which fits within a restricted, but existing budget. Where possible less energy-intensive technology and product design choices should be used to ‘leapfrog’ emissions-intensive intermediate technology and jump straight to cleaner solutions.”
[edit] Related articles on Designing Buildings
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
The Master Builder: William Butterfield and his times. Book review.
Why construction can't afford to ignore the skills gap.
Building Safety Regulator, 19 August
Gill Kernick appointed Independent Chair of Residents’ Panel.
Connecting knowledge, technology and conservation
Building competence for the future of built heritage.
Building Regulations and Building Safety Act
CIOB publishes free advice for non-domestic clients.
Building Safety Newsletter from MHCLG.
An extraordinary record of steel engineering worldwide.
Households living near new pylons to save on bills.
ECA warns growth must not outpace grid capacity or skills.
The role of the client and decision making
CIOB response to built environment professions call for evidence.
Construction's sustainability reporting revolution
Tracking upfront embodied carbon with digital tools.
ECA welcomes procurement reforms
Public spending must back British jobs and skills.


















Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.