File:Cottam power station.jpg
Cottam Power Station in 2023 after the partial demolition of the turbine hall (Photo: Isaac Bee, Wikimedia). Source: “The protection and reuse of large industrial structures” in the Institute of Historic Building Conservation’s (IHBC’s) Context 186, published in September 2025, written by Peter de Figueiredo, the reviews editor of Context. https://ihbconline.co.uk/cont_arch/?p=1596 Not for re-use.
File history
Click on a date/time to view the file as it appeared at that time.
| Date/Time | Thumbnail | Dimensions | User | Comment | |
|---|---|---|---|---|---|
| current | 06:05, 28 June 2026 | 1,204 × 596 (211 KB) | Designing Buildings (Talk | contribs) | (Cottam Power Station in 2023 after the partial demolition of the turbine hall (Photo: Isaac Bee, Wikimedia). Source: “The protection and reuse of large industrial structures” in the Institute of Historic Building Conservation’s (IHBC’s) Context 186, published in September 2025, written by Peter de Figueiredo, the reviews editor of Context. https://ihbconline.co.uk/cont_arch/?p=1596 Not for re-use.) |
- Edit this file using an external application (See the setup instructions for more information)
File usage
The following page links to this file:
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
The adaptive reuse of large industrial structures.
Promoting the circular economy by extending the life of buildings.
CIAT responds to Climate Change Committee report
An urgent wake-up call for both government and the built environment.
Construction Management, 24 June
FMB pilot aims to build pipeline of site-ready tradespeople.
A quick introduction.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
















