File list
This special page shows all uploaded files. When filtered by user, only files where that user uploaded the most recent version of the file are shown.
| Thumbnail | Date |
Name | User | Size | Description | Versions |
|---|---|---|---|---|---|---|
| 14:56, 22 May 2017 | Labourmanifesto.jpg (file) | Editor | 42 KB | 1 | ||
| 14:55, 22 May 2017 | Greenmanifesto.jpg (file) | Editor | 19 KB | 1 | ||
| 14:55, 22 May 2017 | Conservative-Manifesto.jpg (file) | Editor | 9 KB | 1 | ||
| 14:23, 22 May 2017 | Shachihoko.JPG (file) | Editor | 120 KB | 1 | ||
| 14:22, 22 May 2017 | Onigawara.jpg (file) | Editor | 111 KB | 1 | ||
| 13:33, 22 May 2017 | Rococo.jpg (file) | Editor | 45 KB | 1 | ||
| 10:13, 22 May 2017 | Dementiahome280.jpg (file) | Editor | 33 KB | 1 | ||
| 10:13, 22 May 2017 | Dementiahome.jpg (file) | Editor | 154 KB | 1 | ||
| 07:56, 22 May 2017 | Asm 2 image.png (file) | [IP address hidden] | 571 KB | 1 | ||
| 06:58, 22 May 2017 | Understanding the factors affecting flashover of a fire in modern buildings 290.jpg (file) | Designing Buildings | 18 KB | (BRE; Understanding the factors affecting flashover of a fire in modern buildings (IP 2/17), written by Richard Chitty. https://www.brebookshop.com/details.jsp?id=327825) | 1 | |
![]() | 06:58, 22 May 2017 | Understanding the factors affecting flashover of a fire in modern buildings.jpg (file) | Designing Buildings | 27 KB | (BRE; Understanding the factors affecting flashover of a fire in modern buildings (IP 2/17), written by Richard Chitty. https://www.brebookshop.com/details.jsp?id=327825) | 1 |
| 14:57, 21 May 2017 | BrickAwards2017website.JPG (file) | Institute of Historic Building Conservation | 147 KB | (Brick Awards 2017 website) | 1 | |
| 14:55, 21 May 2017 | SkylineCampaignwebsiteMay2017.JPG (file) | Institute of Historic Building Conservation | 146 KB | (Skyline Campaign website) | 1 | |
| 14:53, 21 May 2017 | IHBC PI webpage.JPG (file) | Institute of Historic Building Conservation | 90 KB | (IHBC Professional Indemnity webpage) | 1 | |
| 08:08, 21 May 2017 | After the fire cropped.jpg (file) | Designing Buildings | 66 KB | (Front cover. After the Fire: London churches in the age of Wren, Hooke, Hawksmoor and Gibbs; Angelo Hornak, The Pimpernel Press, 384 pages, approx 400 illustrations, 2016, ISBN 978 1 910258 08 8, 50. Source IHBC's Context 148, March 2017. http://ihbc.org.) | 1 | |
| 07:51, 21 May 2017 | After the fire.jpg (file) | Designing Buildings | 125 KB | (Front cover. After the Fire: London churches in the age of Wren, Hooke, Hawksmoor and Gibbs; Angelo Hornak, The Pimpernel Press, 384 pages, approx 400 illustrations, 2016, ISBN 978 1 910258 08 8, £50. Source IHBC's Context 148, March 2017. http://ihbc.o) | 1 | |
![]() | 06:54, 20 May 2017 | Cover systems for land regeneration BR465.jpg (file) | Designing Buildings | 24 KB | (Cover systems for land regeneration - thickness of cover systems for contaminated land (BR465). Image source Building Research Establishment BRE https://www.brebookshop.com/details.jsp?id=326694) | 1 |
| 16:42, 19 May 2017 | Better-buildings-learning-from-buildings-in-use.jpg (file) | Editor | 10 KB | 1 | ||
| 14:40, 19 May 2017 | Gutters.jpg (file) | Editor | 60 KB | 1 | ||
| 13:44, 19 May 2017 | BIM6.png (file) | Sequeira Carla | 284 KB | 1 | ||
| 13:42, 19 May 2017 | BIM5.png (file) | Sequeira Carla | 308 KB | 1 | ||
| 13:23, 19 May 2017 | FOC.jpg (file) | Sequeira Carla | 6.82 MB | 1 | ||
| 13:15, 19 May 2017 | MBA.PNG (file) | Sequeira Carla | 839 KB | 1 | ||
| 09:46, 19 May 2017 | Newton canal basin mid 19th century 290.jpg (file) | Designing Buildings | 41 KB | (Newton canal basin - mid 19th century. Image source Context 20, published by the Association of Conservation Officers (now The Institute of Historic Building Conservation) in Autumn 1998. http://ihbconline.co.uk/cont_arch/?p=426) | 1 | |
| 09:45, 19 May 2017 | Newton canal basin mid 19th century.jpg (file) | Designing Buildings | 544 KB | (Newton canal basin - mid 19th century. Image source Context 20, published by the Association of Conservation Officers (now The Institute of Historic Building Conservation) in Autumn 1998. http://ihbconline.co.uk/cont_arch/?p=426) | 1 | |
| 09:37, 19 May 2017 | Nec4-works-contracts280.jpg (file) | Editor | 22 KB | 1 | ||
| 09:20, 19 May 2017 | Acoustic Insulation Market (2).jpg (file) | Jadhav.Yesh | 43 KB | (Sound proofing and acoustic insulation materials are used either for noise reduction or noise absorption. Acoustic design is a complex facet of architecture and construction, and it is utilized to manufacture acoustic insulation systems to achieve proper ) | 1 | |
| 09:07, 19 May 2017 | Acoustic Insulation Marketsss.jpg (file) | Jadhav.Yesh | 57 KB | (Sound proofing and acoustic insulation materials are used either for noise reduction or noise absorption. Acoustic design is a complex facet of architecture and construction, and it is utilized to manufacture acoustic insulation systems to achieve proper ) | 3 | |
| 09:05, 19 May 2017 | Talent1.png (file) | Sequeira Carla | 388 KB | 1 | ||
| 08:58, 19 May 2017 | Uandigreenbelt280.jpg (file) | Editor | 34 KB | 1 | ||
| 08:57, 19 May 2017 | Uandigreenbelt.jpg (file) | Editor | 202 KB | 1 | ||
| 08:55, 19 May 2017 | Talent.jpg (file) | Sequeira Carla | 35 KB | 1 | ||
| 14:15, 18 May 2017 | Notre Dame du Haut280.jpg (file) | Editor | 19 KB | 1 | ||
| 14:15, 18 May 2017 | Notre Dame du Haut3.jpg (file) | Editor | 199 KB | 1 | ||
| 14:14, 18 May 2017 | Notre Dame du Haut2.jpg (file) | Editor | 137 KB | 1 | ||
| 14:14, 18 May 2017 | Notre Dame du Haut1.jpg (file) | Editor | 114 KB | 1 | ||
| 12:11, 18 May 2017 | Galvanisedsteel.jpg (file) | Editor | 109 KB | 1 | ||
![]() | 10:53, 18 May 2017 | Soilventpipe.jpg (file) | Editor | 11 KB | 1 | |
| 10:09, 18 May 2017 | Greener-cities280.jpg (file) | Editor | 24 KB | 1 | ||
| 14:50, 17 May 2017 | Roof-garden-with-plants-and-planters.jpg (file) | Editor | 60 KB | 1 | ||
| 14:30, 17 May 2017 | Hollow-Core-with-Chipboard HighRes.jpg (file) | Editor | 6.2 MB | 1 | ||
| 12:06, 17 May 2017 | Hunkypunk280.jpg (file) | Editor | 37 KB | 1 | ||
| 11:55, 17 May 2017 | Hunkypunk2.JPG (file) | Editor | 62 KB | 1 | ||
| 11:55, 17 May 2017 | Hunkypunk.JPG (file) | Editor | 46 KB | 1 | ||
| 09:32, 17 May 2017 | Skyscraperpic280.jpg (file) | Editor | 14 KB | 1 | ||
| 09:15, 17 May 2017 | Infrastructure-bus280.jpg (file) | Editor | 19 KB | 1 | ||
| 09:14, 17 May 2017 | Infrastructure-bus.jpg (file) | Editor | 37 KB | 1 | ||
| 09:10, 17 May 2017 | EFFEKT280.jpg (file) | Editor | 18 KB | 1 | ||
| 09:10, 17 May 2017 | EFFEKT4.jpg (file) | Editor | 87 KB | 1 | ||
| 09:09, 17 May 2017 | EFFEKT3.jpg (file) | Editor | 125 KB | 1 |
![]() First page |
![]() Previous page |
![]() Next page |
![]() Last page |
Featured articles and news
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties at 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.






Date























