Tomorrow's challenges in today's buildings terms and conditions
Click here to return to the competition details.
- The judges’ decision is final and not subject to appeal. No correspondence will be entered into.
- Designing Buildings Ltd (DBL) reserves the right to present no prize if an insufficient number of deserving entries is received.
- DBL reserves the right, at its sole and absolute discretion, to use names, entry details and information about participants without obtaining further consent from the participant or providing any payment whatsoever to the participant for any commercial or non-commercial endeavours, publicity, advertising, trade or promotion in perpetuity.
- DBL reserves the right to modify the format and content of entries for publication purposes.
- DBL will not be responsible or liable for any problem, loss or damage of whatsoever nature suffered by any party due to any delay and/or failure in submitting entries to the competition.
- DBL will not be responsible or liable for any costs, problems, damage or loss of whatsoever nature to the participants resulting from their participation in the competition.
- DBL reserves the right to disqualify any participant that it determines is directly or indirectly tampering with the entry process or the operation of the competition and/or to be acting in breach or potential breach of these terms and conditions.
- Entries may reference (and hyperlink) other sources, but must not plagiarise them. Quotes and references must be clearly marked. Any form of plagiarism may result in disqualification. It is the responsibility of the participant to ensure that their entry does not infringe the copyright of any third party (including the use of images) or any other laws.
- Entries may only be submitted online following the instructions provided.
- Late entries will not be considered by the judges as part of this competition.
- DBL is responsible for administering this competition. BSRIA is responsible for awarding the prize.
- All enquiries should be directed to DBL at [email protected]. BSRIA will not enter into any correspondence.
- Entries should be submitted in English.
- Entry to the competition is deemed an acceptance of DBL’s general terms and conditions of use.
Featured articles and news
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.
The 2025 draft NPPF in brief with indicative responses
Local verses National and suitable verses sustainable: Consultation open for just over one week.
Increased vigilance on VAT Domestic Reverse Charge
HMRC bearing down with increasing force on construction consultant says.
Call for greater recognition of professional standards
Chartered bodies representing more than 1.5 million individuals have written to the UK Government.
Cutting carbon, cost and risk in estate management
Lessons from Cardiff Met’s “Halve the Half” initiative.
Inspiring the next generation to fulfil an electrified future
Technical Manager at ECA on the importance of engagement between industry and education.
Repairing historic stone and slate roofs
The need for a code of practice and technical advice note.
Environmental compliance; a checklist for 2026
Legislative changes, policy shifts, phased rollouts, and compliance updates to be aware of.
UKCW London to tackle sector’s most pressing issues
AI and skills development, ecology and the environment, policy and planning and more.
Managing building safety risks
Across an existing residential portfolio; a client's perspective.
ECA support for Gate Safe’s Safe School Gates Campaign.
Core construction skills explained
Preparing for a career in construction.
Retrofitting for resilience with the Leicester Resilience Hub
Community-serving facilities, enhanced as support and essential services for climate-related disruptions.
Some of the articles relating to water, here to browse. Any missing?
Recognisable Gothic characters, designed to dramatically spout water away from buildings.
A case study and a warning to would-be developers
Creating four dwellings... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
























