Analogous estimating
Should cost modelling, Development Guidance, Version 1.0, published by Government Commercial Function in May 2021 states: ‘This technique takes data and learnings from previous services, projects or programmes and uses them to represent what future costs might be. It takes information about elements of services, projects or programmes that are similar in nature and allows them to inform what proposed costs might be in future models. These estimates can then be recalibrated for known differences between services, projects or programmes and used within a model. These techniques are often used in early phases of model development and are less accurate than other methods.’
[edit] Related articles on Designing Buildings
Featured articles and news
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
UK Construction Week, London is here !
Debuting major international pavilions and much more.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.