RORO shipping
This article is about roll-on/roll-off (RORO or ro-ro) ships that carry vehicles. Types of RORO vessels include ferries, cruise ferries, cargo ships, barges and RORO services for air deliveries.
Other RORO terms include:
- RORO trains or rolling highways.
- RORO railroad car or autorack.
- RORO trailing towed by a tractor or car carrier trailer.
- RORO roll-out/roll-in computer memory management.
RORO ships are designed to carry wheeled cargo, such as cars, trucks, semi-trailer trucks, buses, trailers, and railroad cars, that are driven on and off the ship on their own wheels or using a platform vehicle, such as a self-propelled modular transporter. This is in contrast to lift-on/lift-off (LOLO) vessels, which use a crane to load and unload cargo.
RORO are vessels equipped with a mobile access ramp allowing the loading and unloading between the edge and the wharf. They are fast and allow short loading/unloading times. RORO vessels have either built-in or shore-based ramps or ferry slips that allow the cargo to be efficiently rolled on and off the vessel when in port.
While smaller ferries that operate across rivers and other short distances often have built-in ramps, the term RORO is generally reserved for large, ocean going vessels. The ramps and doors may be located in the stern, bow, sides or any combination thereof.
[edit] Related articles on Designing Buildings
Featured articles and news
Professional practical experience for Architects in training
The long process to transform the nature of education and professional practical experience in the Architecture profession following recent reports.
A people-first approach to retrofit
Moving away from the destructive paradigm of fabric-first.
International Electrician Day, 10 June 2025
Celebrating the role of electrical engineers from André-Marie Amperè, today and for the future.
New guide for clients launched at Houses of Parliament
'There has never been a more important time for clients to step up and ...ask the right questions'
The impact of recycled slate tiles
Innovation across the decades.
EPC changes for existing buildings
Changes and their context as the new RdSAP methodology comes into use from 15 June.
Skills England publishes Sector skills needs assessments
Priority areas relating to the built environment highlighted and described in brief.
BSRIA HVAC Market Watch - May 2025 Edition
Heat Pump Market Outlook: Policy, Performance & Refrigerant Trends for 2025–2028.
Committing to EDI in construction with CIOB
Built Environment professional bodies deepen commitment to EDI with two new signatories: CIAT and CICES.
Government Grenfell progress report at a glance
Line by line recomendation overview, with links to more details.
An engaging and lively review of his professional life.
Sustainable heating for listed buildings
A problem that needs to be approached intelligently.
50th Golden anniversary ECA Edmundson apprentice award
Deadline for entries has been extended to Friday 27 June, so don't miss out!
CIAT at the London Festival of Architecture
Designing for Everyone: Breaking Barriers in Inclusive Architecture.
Mixed reactions to apprenticeship and skills reform 2025
A 'welcome shift' for some and a 'backwards step' for others.
Comments
One thing the article could have touched upon more is the seamless integration of RORO shipping with other transportation methods, such as trucking. For instance, once vehicles are offloaded from a RORO ship, they can be quickly transferred to platforms like real trucking for their onward journey. Such integration ensures not only swift delivery but also reduces potential damages or mishandlings.