Reuse potential
Contents |
Definition
The reuse potential of an assembly is a measure that expresses the likelihood that the parts of that assembly can be disassembled simply, fast and without damage, and thus reused.
Reuse potential can be calculated for a smaller assembly or for a whole building. It relies on aspects such as the compatibility and independence of its parts, and evaluates criteria such as functional and technical autonomy, assembly sequence, connection reversibility and component geometry.
Guidelines
Both reuse potential and transformation capacity are measures of the reversibility of a building. At this moment, the implementation of the concept ‘reuse potential’ is under development. Therefore, the proposed definition will be detailed during the project.
Related terms
The Reuse Potential Tool assesses a component or assembly’s reuse potential. Hence, it supports the design of components and assemblies with a high reuse potential, resulting in an incentive for future reuse.
References
Durmisevic E. (2006). Transformable building structures: design for disassembly as a way to introduce sustainable engineering to building design and construction (doctoral thesis). Delft: TUDelft
--BAMB - Buildings As Material Banks 08:00, 15 Aug 2018 (BST)
Related articles on Designing Buildings Wiki
Featured articles and news
Building safety, a shifting landscape for professionals
A commentary from the insurance perspective.
In brief with further links.
Walter Segal: self-built architect
A definitive book on a pioneer of green architecture.
Funding for heritage on the high street
Using heritage as a catalyst for reviving historic centres.
Commonwealth Heads of Government Meeting update.
Declaration prioritising sustainable urbanisation adopted.
A small hidden, often distant but key building component.
Some brief words about the actuator.
CIAT Chief Executive steps down.
After 34 years at the Institute.
Volunteer opportunity launched by the ICE
To support the next generation of engineers.
Provisional findings show illegal cartels in the industry.
CIAT reporting from the Competition and Markets Authority.
Making sustainable construction number one priority.
The future of construction report.
Interview with ECA CEO.
Many provisions came into force on June 28, 2022.
With room to expand.
An information packed session at the BSRIA conference.
Refurbishment, Energy Efficiency, Indoor air and process.
Considering building acoustics with the AT Journal.
Why building acoustic considerations must be non-negotiable.
Create a profile, write informed product articles and share.
Aluminium Composite Panels (ACP) is one example.
Top 50 Women in engineering 2022.
Inventors and innovators at ICE.
Life, death and art at the Stuart court. Book review.
Real estate, place adaptation and innovation.
Review and comment on the revised draft before July 11.
We are indeed now 10 years old, so go on and be bold !
Write about something you know, help us build and grow !
IHBC's 25th anniversary 2022 Aberdeen School.
A blended event and triumphant return.
New Construction Leadership Council Co-Chair selected.
Mark Reynolds succeeds Andy Mitchell as Co-Chair of CLC
Designing Buildings is 10 years old.
Types of work to existing buildings.
From alteration to deconstruction on DB.