Charge-out rate
A charge-out rate is typically used to allocate the costs of a resource that is shared among multiple users. In construction, it is often used to calculate fees for a labour resource, taking into account unproductive and non-chargeable hours.
Chargeable hours are those that are spent providing direct services for a client. For example, a consultant may calculate their fee by multiplying the number of hours a particular job will take by a charge-out rate, which enables them to cover their costs. This rate must take into account holidays, sick leave and other non-chargeable work.
There is no fixed method of calculating a charge-out rate, however, a consultant for example, might calculate the annual cost of their labour (including salary, benefits and taxes), plus overhead costs and a profit allowance. Then, the total amount is divided by the total chargeable hours per year to arrive at a charge-out rate.
Tradespeople, such as plumbers or joiners, may charge separately for materials used.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.