Albany Road Architect Elephant and Castle development
Albany Road Architect Development
This new residential development offers three desirable apartments in a fantastic location.
The development consists of an existing brick building from the 1950's with two new extensions; an aluminium mesh clad two storey element to the front corner and a charred timber clad unit on top.
The material palette was inspired by the industrial history and vibrancy of the now disused Surrey canal, an anchor point for Burgess park's location directly opposite the building. The cladding of the top box is in burnt larch, an ancient japanese art of burning timber called Shou Sugi Ban (or Yakisugi), that preserves wood by charing it with fire. This unique technic creates a waterproof, extremely durable, and paradoxically fire-resistant material with a rich, deeply-textured appearance and colours ranging from inky black to silver grey that shimmers in the light.
This marries together with the shimmering silver aluminium mesh that clads the corner extension and which adjoins a fair-faced cast concrete light-well garden that draws light from the South into the basement level. The facades feature full height picture windows to maximise light, with some stunning views across Burgess Park in every apartment that is complemented by the choice of natural materials inside.
Designed by Emulsion, a vibrant London based architecture practice, featured on Dezeen and in Wallpaper magazine for its holistic approach to design, shapes and materials. This year named one of Britain's best emerging architecture practice in the UK by The Architecture Foundation and published in their New Architects 3 publication.
Featured articles and news
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.

























