Ultrasonic meter
Heat Meter Accuracy Testing, published by the Department for Business, Energy & Industrial Strategy in November 2016, suggests that:
Ultrasonic flow measurement using the transit-time differential method is now one of the most universally applied flow metering processes. Flow is generally measured using the bidirectional ultrasonic technique based on the transit time method, with proven long-term stability and accuracy. Two ultrasonic transducers are used to send the sound signal both against and with the flow direction. The ultrasonic signal travelling with the flow direction reaches the opposite transducer first. The time difference between the two signals can be converted to a flow velocity and thus a volume. Ultrasonic meters are non-invasive and have no moving parts. Long unimpeded inlet runs are needed for accurate measurement. |
[edit] Related articles on Designing Buildings Wiki
- District energy networks.
- Electromagnetic meters.
- Heat interface units.
- Heat meter.
- Heat metering
- Heat Networks Investment Project HNIP.
- Multi-jet meter
- National heat map.
- Smart meter.
- The future of heat.
- Ultrasonic pipe testing.
- Velocity-type meter
- Water source heat map.
- What can government do about district heating.
Featured articles and news
Design and construction material libraries
Material, sample, product or detail libraries a key component of any architectural design practice.
Construction Products Reform Green Paper and Consultation
Still time to respond as consultation closes on 21 May 2025.
Resilient façade systems for smog reduction in Shanghai
A technical approach using computer simulation and analysis of solar radiation, wind patterns, and ventilation.
Digital technology, transformation and cybersecurity
Supporting SMEs through Digitalisation in Construction.
Villa Wolf in Gubin, history and reconstruction. Book review.
Construction contract awards down £1bn
Decline over the past two months compared to the same period last year, follows the positive start to the year.
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.