Residual risk in building development
The development of buildings is carried out in several phases, all involving hazard, uncertainty and risk. Risks which may occur on construction projects can sometimes be designed out or avoided. Remaining risks may be:
- Transferred to the contractor.
- Shared by the employer and contractor.
- Retained by the employer.
According to NRM2: Detailed measurement for building works, the term ‘residual risk’, or ‘retained risk’ refers to risks retained by the employer, that is, unexpected expenditure arising from risks that materialise, which are retained by the employer rather than being transferred to the contractor.
The employer may ask the contractor to provide a price for taking on a risk themselves before deciding to retain a risk.
Residual risks retained and managed by the employer or their project team are described as the employer’s residual risk exposure. Risk allowances should be included in cost plan to provide for this exposure.
Government Functional Standard, GovS 002: Project delivery; portfolio, programme and project management, Version: 2.0, published on 15 July 2021 by HM Government, defines a residual risk as: ‘The risk remaining after the risk response has been applied.’
[edit] Related articles on Designing Buildings
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.