User contributions
(Latest | Earliest) View (newer 250 | older 250) (20 | 50 | 100 | 250 | 500)
- 21:39, 2 October 2020 (diff | hist) User:ConSIG CWG
- 21:36, 2 October 2020 (diff | hist) Temporary Works Design - A Quality Management Perspective
- 21:26, 2 October 2020 (diff | hist) N Temporary Works Design - A Quality Management Perspective (Created page with "= Introduction = ‘Temporary works’ is a widely used expression in the construction industry. It may be useful to consider a respected definition to begin. BS 5975:2019 – C...")
- 21:02, 2 October 2020 (diff | hist) N File:086 Fig 1 Risk Management Process.png (top)
- 20:54, 2 October 2020 (diff | hist) N File:086 Fig 2 Temporary Works Process.png (top)
- 15:18, 17 August 2020 (diff | hist) N Checking and approval in design (Redirected page to Checking and approval in design - a quality management perspective) (top)
- 15:18, 17 August 2020 (diff | hist) N Checking design (Redirected page to Checking and approval in design - a quality management perspective) (top)
- 15:15, 17 August 2020 (diff | hist) User:ConSIG CWG
- 15:10, 17 August 2020 (diff | hist) Quality checklist
- 15:09, 17 August 2020 (diff | hist) Checking and approval in design - a quality management perspective
- 15:06, 17 August 2020 (diff | hist) Quality checklist
- 15:03, 17 August 2020 (diff | hist) User:ConSIG CWG
- 21:05, 15 August 2020 (diff | hist) User:ConSIG CWG
- 21:01, 15 August 2020 (diff | hist) Checking and approval in design - a quality management perspective
- 20:58, 15 August 2020 (diff | hist) Checking and approval in design - a quality management perspective
- 20:52, 15 August 2020 (diff | hist) Checking and approval in design - a quality management perspective
- 20:48, 15 August 2020 (diff | hist) Checking and approval in design - a quality management perspective
- 20:41, 15 August 2020 (diff | hist) Checking and approval in design - a quality management perspective
- 20:30, 15 August 2020 (diff | hist) N Checking and approval in design - a quality management perspective (Created page with "= Introduction = Procedures for control of design and construction must have originated in early history. The Great Pyramid of Giza, Egypt is famous for the accuracy of the geom...")
- 17:49, 15 August 2020 (diff | hist) Quality checklist
- 17:48, 15 August 2020 (diff | hist) N Quality checklist (Created page with "= Background = The toolkit of Quality Management professional typically includes various tools and techniques to help in the process of quality planning (setting out requirement...")
- 17:37, 15 August 2020 (diff | hist) N File:003.4 Checklists Fig3.png (top)
- 17:35, 15 August 2020 (diff | hist) N File:003.4 Checklists Fig2.png (top)
- 17:33, 15 August 2020 (diff | hist) N File:003.4 Checklists Fig1.png (top)
- 15:01, 10 February 2020 (diff | hist) User:ConSIG CWG
- 07:47, 24 January 2020 (diff | hist) User:ConSIG CWG
- 13:01, 15 January 2020 (diff | hist) Cost of quality (COQ)
- 12:59, 15 January 2020 (diff | hist) Cost of quality (COQ)
- 12:56, 15 January 2020 (diff | hist) N Cost of quality (COQ) (Created page with "== What is cost of quality (COQ)? == More accurately the question should be `What is the cost of poor quality?` or even `What is the cost of not getting it right first time?`. T...")
- 12:35, 15 January 2020 (diff | hist) N File:Cost of quality Figure 2.png (top)
- 12:34, 15 January 2020 (diff | hist) N File:Cost of quality Figure 1.png (top)
- 12:52, 14 January 2020 (diff | hist) Quality management systems (QMS) - beyond the documentation
- 12:44, 14 January 2020 (diff | hist) Quality management systems (QMS) - beyond the documentation
- 12:28, 14 January 2020 (diff | hist) N Quality management systems (QMS) - beyond the documentation (Created page with "= Introduction = For many organisations, the quality management system (QMS) exists to save money. For others it provides assurance that its systems are robust and meet a set of...")
- 12:25, 14 January 2020 (diff | hist) N File:Cultural Web.gif (Diagram for ConSIG article: Quality management systems (QMS) - beyond the documentation) (top)
- 09:25, 19 September 2019 (diff | hist) User:ConSIG CWG
- 09:58, 9 September 2019 (diff | hist) Digital quality management in construction
- 09:50, 9 September 2019 (diff | hist) N File:Digital management in construction Figure 1.png (Digital quality management in construction Figure 1) (top)
- 09:41, 9 September 2019 (diff | hist) N Digital quality management in construction (Created page with "= Introduction = Managing the quality of design and construction has been a skill set for millennia, dating back to the earliest structures, when accepting and rejecting the qua...")
- 13:34, 3 July 2019 (diff | hist) User:ConSIG CWG
- 13:33, 3 July 2019 (diff | hist) User:ConSIG CWG
- 11:46, 18 June 2019 (diff | hist) N Auditing management systems (Created page with "= 1.Introduction = Auditing is a prime way of locating risk in management systems and acting to reduce that risk to as low as reasonably practicable. It is key to continuous imp...")
- 19:27, 26 May 2019 (diff | hist) Failure modes and effect analysis (FMEA)
- 19:17, 26 May 2019 (diff | hist) Failure modes and effect analysis (FMEA)
- 19:05, 26 May 2019 (diff | hist) N Failure modes and effect analysis (FMEA) (Created page with "== What is FMEA and when is it used? == FMEA is a step by step approach for collecting knowledge about possible points of failure in a design, manufacturing or construction proc...")
- 17:55, 26 May 2019 (diff | hist) File:Picture1.jpg (Replaced content with " ") (top)
- 17:53, 26 May 2019 (diff | hist) Quality tools: fishbone diagram
- 17:52, 26 May 2019 (diff | hist) File:Picture1.jpg (uploaded a new version of "File:Picture1.jpg")
- 17:49, 26 May 2019 (diff | hist) N File:Picture1.jpg (Fishbone diagram)
- 17:46, 26 May 2019 (diff | hist) N File:Picture1.pdf (Fishbone diagram) (top)
- 17:43, 26 May 2019 (diff | hist) Quality tools: fishbone diagram
- 17:35, 26 May 2019 (diff | hist) N File:Picture1.png (top)
- 17:30, 26 May 2019 (diff | hist) Quality tools: fishbone diagram
- 17:24, 26 May 2019 (diff | hist) Quality tools: fishbone diagram
- 17:15, 26 May 2019 (diff | hist) N Quality tools: fishbone diagram (Created page with "What is it? Created by Kaoru Ishikawa in the 1960s, the Fishbone diagram (cause and effect diagram) is a visual tool that shows the potential relationship between a topic (outpu...")
- 13:08, 27 March 2019 (diff | hist) N Quality culture and behaviours (Created page with "== Introduction == A quality culture is often described as a mind-set throughout the organisation with shared values and beliefs. Many construction companies have embraced beha...")
- 14:14, 28 February 2019 (diff | hist) Quality manuals and quality plans
- 13:32, 28 February 2019 (diff | hist) 5 Whys
- 13:31, 28 February 2019 (diff | hist) N 5 Whys (Created page with "= 5 Whys = Introduction The ‘root cause’ is the true or underlying reason why something has happened - usually something that has gone wrong. Finding the root cause enables...")
- 14:55, 1 February 2019 (diff | hist) The importance of welding assurance
- 14:07, 1 February 2019 (diff | hist) Stakeholder management: a quality perspective
- 14:01, 1 February 2019 (diff | hist) N File:CQI Stakeholder management diag 2.png (Stakeholder mapping) (top)
- 14:00, 1 February 2019 (diff | hist) N File:CQI Stakeholder management diag 1.png (ODA legacy diagram) (top)
- 13:53, 1 February 2019 (diff | hist) Stakeholder management: a quality perspective
- 13:52, 1 February 2019 (diff | hist) Stakeholder management: a quality perspective
- 13:39, 1 February 2019 (diff | hist) Stakeholder management: a quality perspective
- 13:17, 1 February 2019 (diff | hist) N Stakeholder management: a quality perspective (Created page with "= Introduction = The increased use of the term ‘stakeholder’ in business – used to describe any group or individual that has some, however small, vested interest or influe...")
- 07:27, 27 January 2019 (diff | hist) Quality manuals and quality plans
- 13:44, 7 January 2019 (diff | hist) Inspection & Test Plan
- 13:51, 6 January 2019 (diff | hist) Building completion
- 13:46, 6 January 2019 (diff | hist) N File:Building completion Fig5.png (top)
- 13:45, 6 January 2019 (diff | hist) N File:Building completion Fig4.png (top)
- 13:45, 6 January 2019 (diff | hist) N File:Building completion Fig3.png (top)
- 13:44, 6 January 2019 (diff | hist) N File:Building completion Fig2.png (top)
- 13:40, 6 January 2019 (diff | hist) Building completion
- 13:39, 6 January 2019 (diff | hist) N File:Building completion Fig1.png (Building completion Fig 1) (top)
- 12:24, 6 January 2019 (diff | hist) Building completion
- 12:13, 6 January 2019 (diff | hist) Building completion
- 11:59, 6 January 2019 (diff | hist) Building completion
- 11:39, 6 January 2019 (diff | hist) N Building completion (Created page with "= Executive summary = Building completion is the critical stage in which the activities that have been undertaken to fulfil the building contact requirements are brought togethe...")
- 15:48, 5 January 2019 (diff | hist) N Collaboration: a quality management perspective (Created page with "== Summary == This article discusses what collaborative working is intended to achieve, emphasising the basis upon which collaboration can be successfully put in place between p...")
- 14:58, 5 January 2019 (diff | hist) The importance of welding assurance
- 14:57, 5 January 2019 (diff | hist) Structural steelwork: a quality perspective
- 14:55, 5 January 2019 (diff | hist) Lifts and Escalators: A Quality Perspective
- 13:49, 5 January 2019 (diff | hist) Quality manuals and quality plans
- 13:44, 5 January 2019 (diff | hist) Design: a quality management perspective
- 13:42, 5 January 2019 (diff | hist) Assurance and self-certification
- 13:41, 5 January 2019 (diff | hist) Assurance and self-certification
- 13:40, 5 January 2019 (diff | hist) Annex SL
- 13:38, 5 January 2019 (diff | hist) CDM Regulations: a quality perspective
- 13:35, 5 January 2019 (diff | hist) Design freeze: a quality perspective
- 13:33, 5 January 2019 (diff | hist) Why should quality be important to the construction industry?
- 13:31, 5 January 2019 (diff | hist) Change control: a quality perspective
- 13:29, 5 January 2019 (diff | hist) Mobilisation to site: a quality perspective
- 13:27, 5 January 2019 (diff | hist) Structural steelwork: a quality perspective
- 13:24, 5 January 2019 (diff | hist) Lifts and Escalators: A Quality Perspective
- 13:23, 5 January 2019 (diff | hist) Lifts and Escalators: A Quality Perspective
- 13:21, 5 January 2019 (diff | hist) Lifts and Escalators: A Quality Perspective
- 13:18, 5 January 2019 (diff | hist) Inspection & Test Plan
- 13:17, 5 January 2019 (diff | hist) How to write an inspection and test plan
(Latest | Earliest) View (newer 250 | older 250) (20 | 50 | 100 | 250 | 500)
BIM Directory
[edit] Building Information Modelling (BIM)
[edit] Information Requirements
Employer's Information Requirements (EIR)
Organisational Information Requirements (OIR)
Asset Information Requirements (AIR)
[edit] Information Models
Project Information Model (PIM)
[edit] Collaborative Practices
Industry Foundation Classes (IFC)