Stockwell bus garage
Lansdowne Way, Stockwell
1951–4, Adie, Button and Partners
Listed grade II*, 29 March 1988
London’s last trams were withdrawn in 1952, leaving a demand for garages to house the expanded bus fleet. There was steel for garages to replace those destroyed in the war, but for new depots, George Adie and Frederick Button resorted to shell concrete, aided by engineer A. E. Beer.
Peckham’s bus garage, now demolished, repeated the construction popularised at the former bus depot in Bournemouth. Stockwell is also spanned by ten concrete beams linked by thin barrel vaults and a ring beam, although its span of 59.1m (194ft) makes it a third wider than the Bournemouth garage, and it is also longer. The difference is the use of arched portal frames – giant ribs that rise from 4.87m (16ft) to 16.46m (54ft) at their centre.
Between them, the arched cylindrical shells soar still higher, and the cathedral-like effect of their vaults is further enhanced by roof lights. To ensure adequate loadings, the frames’ reinforcement bars were welded rather than lapped – perhaps the roof’s greatest technical novelty. Some 200 buses can be garaged here.
This was first published in 'England's Post-War Listed Buildings' by Elain Harwood and James O. Davies. Read a review of the book and interview with Elain Harwood here.
Read other extracts from the book:
Featured articles and news
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.