Edge of centre definition
The National Planning Policy Framework (NPPF) suggests that for retail purposes, the phrase 'edge of centre' refers to:
'... a location that is well connected and up to 300 m of the primary shopping area. For all other main town centre uses, a location within 300 m of a town centre boundary. For office development, this includes locations outside the town centre but within 500 m of a public transport interchange. In determining whether a site falls within the definition of edge of centre, account should be taken of local circumstances.'
However, it is not entirely clear what the first sentence means and whether there is a typographical error in this definition (there are several other errors in the NPPF). It might better read '... a location that is well connected and up to 300 m from the primary shopping area.'
Town centres, Supplementary planning guidance, published by the Mayor of London in July 2014, defines edge-of-centre as: ‘For retail purposes, a location that is well connected and up to 300 metres of the primary shopping area. For all other main town centre uses, a location within 300 metres of a town centre boundary. For office development, this includes locations outside the town centre but within 500 metres of a public transport interchange. In determining whether a site falls within the definition of edge of centre, account should be taken of local circumstances.’
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.