Delivering Sustainable Buildings: Savings and Payback, Office Case Study for BREEAM UK New Construction 2018
Delivering Sustainable Buildings: Savings and Payback, Office Case Study for BREEAM UK New Construction 2018, was written by Christopher Ward (BRE) and Adam Mactavish (Currie & Brown) and published by BRE in 2020.
BREEAM is the leading sustainability assessment and certification scheme for the built environment. The aim of the BREEAM schemes is to encourage continuous performance improvement and innovation by assessing developments against a broad range of requirements that go beyond standard practice. BREEAM rated developments are more sustainable environments.
This BRE Briefing Paper follows on previous work BRE has undertaken with Currie & Brown in 2014 and 2017 on the cost implications of achieving BREEAM UK New Construction ratings of ‘Very Good’ and ‘Excellent’ for a model office building. These previous studies challenged the perception that sustainable buildings are inevitably more costly to build, and added to the growing evidence base demonstrating the low costs of achieving greater sustainability.
The latest study updates the previous cost models for the office building case study to reflect current construction costs and the updated requirements introduced by BREEAM UK New Construction 2018.
The Briefing Paper concludes that:
- For both ‘Very Good’ scenarios, the BREEAM related capital cost uplifts over the baseline building’s overall construction costs are less than 0.25%.
- For the two ‘Excellent’ scenarios, the capital cost uplifts are less than 0.75%.
- The updated requirements in BREEAM UK New Construction 2018 have had very little impact on the additional capital costs of achieving ‘Very Good’ or ‘Excellent’ ratings.
- The savings from the energy efficiency improvement measures required to achieve ‘Excellent’ ratings quickly payback the additional capital investment.
You can download the Briefing Paper at https://files.bregroup.com/breeam/briefingpapers/Delivering-Sustainable-Buildings-Savings-and-Payback-Office-Case-Study-BREEAM-NC-2018_BREEAM_BRE_115359_BriefingPaper.pdf
[edit] Related articles on Designing Buildings Wiki
- BREEAM Life cycle cost and service life planning.
- BREEAM value increases while costs reduce.
- BREEAM Wiki.
- BREEAM.
- Building Research Establishment.
- Delivering Sustainable Buildings: Savings and Payback – Office Case Study for BREEAM UK New Construction 2014.
- Delivering sustainable buildings: Savings and payback FB 63.
- Utilising life cycle costing and life cycle assessment.
Featured articles and news
ECA support for Gate Safe’s Safe School Gates Campaign.
Core construction skills explained
Preparing for a career in construction.
Retrofitting for resilience with the Leicester Resilience Hub
Community-serving facilities, enhanced as support and essential services for climate-related disruptions.
Some of the articles relating to water, here to browse. Any missing?
Recognisable Gothic characters, designed to dramatically spout water away from buildings.
A case study and a warning to would-be developers
Creating four dwellings... after half a century of doing this job, why, oh why, is it so difficult?
Reform of the fire engineering profession
Fire Engineers Advisory Panel: Authoritative Statement, reactions and next steps.
Restoration and renewal of the Palace of Westminster
A complex project of cultural significance from full decant to EMI, opportunities and a potential a way forward.
Apprenticeships and the responsibility we share
Perspectives from the CIOB President as National Apprentice Week comes to a close.
The first line of defence against rain, wind and snow.
Building Safety recap January, 2026
What we missed at the end of last year, and at the start of this...
National Apprenticeship Week 2026, 9-15 Feb
Shining a light on the positive impacts for businesses, their apprentices and the wider economy alike.
Applications and benefits of acoustic flooring
From commercial to retail.
From solid to sprung and ribbed to raised.
Strengthening industry collaboration in Hong Kong
Hong Kong Institute of Construction and The Chartered Institute of Building sign Memorandum of Understanding.
A detailed description from the experts at Cornish Lime.
IHBC planning for growth with corporate plan development
Grow with the Institute by volunteering and CP25 consultation.
Connecting ambition and action for designers and specifiers.
Electrical skills gap deepens as apprenticeship starts fall despite surging demand says ECA.
Built environment bodies deepen joint action on EDI
B.E.Inclusive initiative agree next phase of joint equity, diversity and inclusion (EDI) action plan.
Recognising culture as key to sustainable economic growth
Creative UK Provocation paper: Culture as Growth Infrastructure.



























