Architect's appointment
[edit] Professional Obligations
A chartered practice must be aware of the three Codes they must follow: ARB, RIBA and RIBA Chartered Practice Codes of Conduct.
- ensure the appointment is written down in accordance with ARB standard 4.4 and RIBA Principle 2.3
- the architect must consider whether they have the skill, knowledge and resource to service the project in accordance with ARC standard 2.4 and RIBA Principle 2.1
- Firms must have adequate PI insurance to cover the project under ARB standard 8 and 9.1, RIBA Principle 3.10 and RIBA Chartered Practice Criteria 5
In addition
- - LOCAL COMMUNITY; RIBA members must have proper concern and regard for the effect that their work has on users, the local community and society under RIBA Principle 2.14
- - HERITAGE/CONSERVATION; ensure that work affecting Heritage Assets is only carried out if you are sufficiently qualified, competent or experienced to do so in the circumstances.
- - ENVIRONMENT; when considering sustainable requirements in the brief or local policy, have regard for RIBA Principle 3.3
[edit] Issues Relating to an Appointment
It is essential that any arrangement between the architect and their client is recorded in writing, even at the earliest stages of a commission.
It is in the interests of both the architect and the client that they fully understand the agreement.
- It is imperative that all staff working on the project understand clearly the limits of the services that the practice is contracted to perform on the project. This can mitigate the risks of producing abortive work and not complying with professional Codes.
- It is important for the client to know exactly what services are being provided so that their expectations can be managed and met by the architect.
Bespoke forms of appointment drafted by the clients solicitors/produced by the client can potentially increase the liability of the architect.
Bespoke forms need to be carefully examined with appropriate advice from professional indemnity insurers and legal advisers.
The appointment document/agreement should;
- define and record the services to be provided
- state the obligations of each party
- identify the associated terms and conditions
- set out the fee proposal, method for calculating the fee and method of payment
The appointment document must state that individual architects are required to be registered with the ARB, and are subject to its Code and to the disciplinary sanction of the ARB in relation to complaints of unacceptable professional conduct or serious professional incompetence.
The architect should write to the client advising them of their responsibilities under the CDM 2015 regulations.
The architects may also wish to refer to any additional services they are able to provide (this may incur an additional fee).
You must sign in or register to edit or comment on an article
Return to Talk:Architect's appointment.
Featured articles and news
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.