User contributions
(Latest | Earliest) View (newer 500 | older 500) (20 | 50 | 100 | 250 | 500)
- 01:08, 10 March 2018 (diff | hist) N File:Why quality Fig 5.png (top)
- 01:05, 10 March 2018 (diff | hist) N File:Why quality Fig 4.png (top)
- 01:00, 10 March 2018 (diff | hist) N File:Why quality Fig 3.png (top)
- 00:57, 10 March 2018 (diff | hist) N File:Why quality Fig 2.png (top)
- 00:49, 10 March 2018 (diff | hist) N File:Why quality Fig 1.png (top)
- 00:25, 10 March 2018 (diff | hist) Why should quality be important to the construction industry?
- 00:20, 10 March 2018 (diff | hist) N Why should quality be important to the construction industry? (Created page with "= Introduction = The well-known 1998 report of the Construction Task Force (chaired by Sir John Egan), Rethinking Construction, identified the Construction Industry as ‘under-...")
- 09:38, 23 January 2018 (diff | hist) Mobilisation to site: a quality perspective
- 09:37, 23 January 2018 (diff | hist) Change control: a quality perspective
- 09:34, 23 January 2018 (diff | hist) Change control: a quality perspective
- 09:32, 23 January 2018 (diff | hist) Mobilisation to site: a quality perspective
- 09:31, 23 January 2018 (diff | hist) Structural steelwork: a quality perspective
- 09:22, 23 January 2018 (diff | hist) User:ConSIG CWG
- 09:20, 23 January 2018 (diff | hist) User:ConSIG CWG
- 23:39, 22 January 2018 (diff | hist) Structural steelwork: a quality perspective
- 23:38, 22 January 2018 (diff | hist) Structural steelwork: a quality perspective
- 23:19, 22 January 2018 (diff | hist) User:ConSIG CWG
- 23:18, 22 January 2018 (diff | hist) User:ConSIG CWG
- 23:17, 22 January 2018 (diff | hist) User:ConSIG CWG
- 23:16, 22 January 2018 (diff | hist) User:ConSIG CWG
- 23:07, 22 January 2018 (diff | hist) Change control: a quality perspective
- 23:06, 22 January 2018 (diff | hist) Structural steelwork: a quality perspective
- 23:05, 22 January 2018 (diff | hist) Mobilisation to site: a quality perspective
- 14:12, 22 January 2018 (diff | hist) Mobilisation to site: a quality perspective
- 14:10, 22 January 2018 (diff | hist) Structural steelwork: a quality perspective
- 14:09, 22 January 2018 (diff | hist) Change control: a quality perspective
- 21:10, 21 January 2018 (diff | hist) N Change control: a quality perspective (Created page with "== Executive summary == Change is a risky business. In particular, it is a significant risk on all construction projects. Therefore, the determination and implementation of chan...")
- 19:08, 19 January 2018 (diff | hist) Structural steelwork: a quality perspective
- 19:03, 19 January 2018 (diff | hist) Mobilisation to site: a quality perspective
- 19:00, 19 January 2018 (diff | hist) Mobilisation to site: a quality perspective
- 18:53, 19 January 2018 (diff | hist) N Mobilisation to site: a quality perspective (Created page with "= Summary = This article documents the critical move from the design phase of a project to its construction on site. It suggests that there is a need for careful planning prior ...")
- 18:37, 19 January 2018 (diff | hist) Structural steelwork: a quality perspective
- 18:34, 19 January 2018 (diff | hist) N Structural steelwork: a quality perspective (Created page with "Introduction and executive summary Steel’s low cost, strength, durability, and recyclability continue to make it a useful choice for construction projects in both structural s...")
- 16:06, 10 January 2018 (diff | hist) Guidance for construction quality management professionals: Structural Steelwork
- 01:01, 8 January 2018 (diff | hist) Inspection & Test Plan
- 13:17, 4 January 2018 (diff | hist) N Guidance for construction quality management professionals: Structural Steelwork (Created page with "Guidance for construction quality management professionals: Structural Steelwork Introduction and executive summary Steel’s low cost, strength, durability, and recyclability ...")
- 14:24, 11 October 2017 (diff | hist) How to write an inspection and test plan
- 00:27, 22 September 2017 (diff | hist) Inspection & Test Plan
- 00:24, 22 September 2017 (diff | hist) Lifts and Escalators: A Quality Perspective
- 00:20, 22 September 2017 (diff | hist) Lifts and Escalators: A Quality Perspective
- 00:14, 22 September 2017 (diff | hist) Lifts and Escalators: A Quality Perspective
- 00:12, 22 September 2017 (diff | hist) N Lifts and Escalators: A Quality Perspective (Created page with "= Introduction = Lifts, escalators and passenger conveyors, known as LEPC hereafter, are a significant part of almost every major building construction or refurbishment project....")
- 00:10, 22 September 2017 (diff | hist) N File:L E Pic 4.png (top)
- 00:09, 22 September 2017 (diff | hist) N File:L E Pic 3.png (top)
- 00:08, 22 September 2017 (diff | hist) N File:L E Pic 2.png (top)
- 00:05, 22 September 2017 (diff | hist) N File:L E Pic 1.png (top)
- 12:23, 19 September 2017 (diff | hist) How to write an inspection and test plan
- 18:36, 18 September 2017 (diff | hist) How to write an inspection and test plan
- 18:34, 18 September 2017 (diff | hist) Inspection & Test Plan
- 18:33, 18 September 2017 (diff | hist) Inspection & Test Plan
- 18:32, 18 September 2017 (diff | hist) Inspection & Test Plan
- 23:27, 14 September 2017 (diff | hist) Inspection & Test Plan
- 23:26, 14 September 2017 (diff | hist) Inspection & Test Plan
- 23:25, 14 September 2017 (diff | hist) How to write an inspection and test plan
- 23:24, 14 September 2017 (diff | hist) Inspection & Test Plan
- 23:23, 14 September 2017 (diff | hist) Inspection & Test Plan
- 23:21, 14 September 2017 (diff | hist) Inspection & Test Plan
- 23:16, 14 September 2017 (diff | hist) How to write an inspection and test plan
- 23:13, 14 September 2017 (diff | hist) How to write an inspection and test plan
- 23:05, 14 September 2017 (diff | hist) Inspection & Test Plan
- 22:56, 14 September 2017 (diff | hist) Inspection & Test Plan
- 22:52, 14 September 2017 (diff | hist) How to write an inspection and test plan
- 22:47, 14 September 2017 (diff | hist) Inspection & Test Plan
- 17:19, 13 September 2017 (diff | hist) How to write an inspection and test plan
- 17:18, 13 September 2017 (diff | hist) Inspection & Test Plan
- 17:15, 13 September 2017 (diff | hist) Inspection & Test Plan
- 17:14, 13 September 2017 (diff | hist) How to write an inspection and test plan
- 17:10, 13 September 2017 (diff | hist) How to write an inspection and test plan
- 17:08, 13 September 2017 (diff | hist) Inspection & Test Plan
- 17:08, 13 September 2017 (diff | hist) Inspection & Test Plan
- 17:07, 13 September 2017 (diff | hist) Inspection & Test Plan
- 17:03, 13 September 2017 (diff | hist) Inspection & Test Plan
- 17:02, 13 September 2017 (diff | hist) Inspection & Test Plan
- 16:58, 13 September 2017 (diff | hist) How to write an inspection and test plan
- 16:56, 13 September 2017 (diff | hist) How to write an inspection and test plan
- 16:55, 13 September 2017 (diff | hist) How to write an inspection and test plan
- 16:54, 13 September 2017 (diff | hist) N File:17 07 28 CONSIG ITP Template Rev 2.0.pdf (top)
- 16:46, 13 September 2017 (diff | hist) How to write an inspection and test plan
- 16:45, 13 September 2017 (diff | hist) Inspection & Test Plan
- 16:39, 13 September 2017 (diff | hist) How to write an inspection and test plan
- 16:37, 13 September 2017 (diff | hist) N File:ITP Fig 10.png (top)
- 16:33, 13 September 2017 (diff | hist) N File:ITP Fig 9.png (top)
- 16:25, 13 September 2017 (diff | hist) N File:ITP Fig 8.png (top)
- 16:23, 13 September 2017 (diff | hist) N File:ITP Fig 7.png (top)
- 16:22, 13 September 2017 (diff | hist) N File:ITP Fig 6.png (top)
- 16:16, 13 September 2017 (diff | hist) N File:ITP Fig 5.png (top)
- 16:15, 13 September 2017 (diff | hist) N File:ITP Fig 4.png (top)
- 16:13, 13 September 2017 (diff | hist) N File:ITP Fig 3.png (top)
- 16:10, 13 September 2017 (diff | hist) N File:ITP Fig2.png (top)
- 16:06, 13 September 2017 (diff | hist) How to write an inspection and test plan
- 16:04, 13 September 2017 (diff | hist) N How to write an inspection and test plan (Created page with "= HOW TO WRITE AN INSPECTION & TEST PLAN = Based on the generic template provided, the following guidance takes you through the process for establishing an ITP: === Step 1 ...")
- 16:02, 13 September 2017 (diff | hist) File:Fig 1.png (uploaded a new version of "File:Fig 1.png") (top)
- 16:01, 13 September 2017 (diff | hist) N File:Fig 1.png
- 15:30, 13 September 2017 (diff | hist) N Inspection & Test Plan (Created page with "= INSPECTION & TEST PLANS (ITPs) = == Executive Summary == The Inspection and Test Plan (ITP) is a quality assurance tool commonly used throughout the construction industry...")
(Latest | Earliest) View (newer 500 | older 500) (20 | 50 | 100 | 250 | 500)
Featured articles and news
What it is and how to use it.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
The ECA Industry Awards 2024 now open !
Recognising the best in the electrotechnical industry.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
BSRIA Building Reg's guidance: The second staircase
An overview focusing on aspects which most affect the building services industry.
Design codes and pattern books
Harmonious proportions and golden sections.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.