Construction Management Software
- Procore:
- Procore is a comprehensive construction management platform that covers project management, document management, financial management, quality and safety control, and more.
- Key features: project scheduling, budget management, collaboration tools, real-time reporting, and mobile access.
- Primavera P6:
- Primavera P6 by Oracle is a robust project portfolio management tool designed for larger construction projects and complex programs.
- Key features: project planning and scheduling, resource management, cost management, risk analysis, and reporting.
- Autodesk BIM 360:
- BIM 360 is a cloud-based construction management platform focusing on Building Information Modeling (BIM) and collaboration.
- Key features: document management, issue tracking, design coordination, field management, and model coordination.
- PlanGrid:
- PlanGrid, an Autodesk company, offers a user-friendly platform for construction document management and collaboration.
- Key features: document storage and version control, punch lists, progress tracking, field reports, and real-time collaboration.
You must sign in or register to edit or comment on an article
Return to Talk:Construction Management Software.
Featured articles and news
A resource for Cleaner Air, Better Tomorrow.
Awe-inspiring medieval great barns.
Registered building inspectors
Building types and conflicts of interest updates explaineed.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.