What is EN 14511?
[edit] What is EN 14511?
EN 14511 sets out standardised performance and rating terms for air-conditioning units, heat pumps and liquid chilling packages that supply space heating or cooling. EN 14511 is used for a determination of the Coefficient of Performance (COP) that gauges the performance of a heat pump.
[edit] What is the COP of a heat pump?
The Coefficient of Performance (COP), as set by EN 14511, is a ratio of the output of the heat pump against the power input in specific laboratory conditions. It is a simple indicator of the energy efficiency of a heat pump. The higher the declared COP of the heat pump, the greater the expected energy efficiency will be. To arrive at the rating, the COP is calculated from data gathered at particular temperatures of the energy source and flow. This can often result in a higher COP rating than the heat pump will achieve when installed.
[edit] The COP and heat pump selection
COP values can be certified through independent testing and a verification process. The COP value is the first likely factor to influence the selection of a heat pump. It is therefore vital that certified and tested values are provided. The energy efficiency and resulting renewables energy contribution of a heat pump are largely determined by the correct specification of the project’s particulars. The sizing and system design will affect the energy efficiency of the system and the building itself. The COP alone is not sufficient to determine the best energy solution for a project, as it does not reflect the true conditions or the project’s energy strategy. Furthermore, a more complex analysis would be required. Please contact our industry experts to discuss in detail which heat pump solution is most suitable for your next project. We can advise on heat pump specification that will reflect your long-term energy strategy and achieve on-site renewable targets that will help to futureproof your project.
--Glen Dimplex Heating & Ventilation 14:59, 10 Aug 2021 (BST)
Featured articles and news
Specifying XPS in masonry cavity walls below DPC level
Moisture requirements, DPCs and third party certification.
Types of rigid foam insulation
A brief description and some of the main construction types.
Metal composite material panel systems MCM and MCP
Sandwich finishes, forms, details, core and their impacts.
Cumbria's vernacular architecture
A history of building impeded by unsettled times.
CIOB and MMC Ireland announce strategic partnership
For better working conditions, and a more productive construction sector.
More than just glass.
Grenfell Phase 2 final report for construction, at a glance
Twenty-three key issues raised and their recommendations.
Industry responds to the final Grenfell inquiry phase 2 report
Construction body responses to the long-awaited 7 volumes.
Chief construction advisers in brief
From July 2008 to November 2015.
The Grenfell phase 2 final report key summary points
And recommendations for the construction industry.
Approved Document B: Fire Safety upcoming updates
Including sprinklers in care homes, National classes and Fire resistance.
CIOB Podcast: 21st Century Construction
Catch up on the many previous episodes.
Tools and processes supporting a robust golden thread
BSRIA Handover Information and O&M Manuals guidance.
Industry survey highlights persistent skills gap
Building engineering business survey by ECA in partnership with BESA, SELECT and SNIPEF.
IHBC Conservation Professional Practice Principles
Spotlighted in HEF Historic Environment Overview.
CIAT collaborates with CIOB, CIfA, Icon to launch The Arc
Helping clients find specialist historic environment professionals.
Government building safety remediation data releases
Show some progress, but a 50% gap not yet started.
Testing For A Safer Future; an initial industry response
A response to the Independent Review of the Construction Product Testing Regime.
Requirements for UK buildings in certain circumstances.