About Raised Floor Solutions
Specialist composite flooring contractor.

Raised Floor Solutions, based in Skelmersdale, Lancashire, was established in 2003 as a specialist composite flooring contractor. RFS is an approved supplier and installer of Kingspan Multideck Steel Decking products and a Tier 1 installer of Kingspan Access Flooring systems.
By combining the expertise of its four specialist trading divisions; Metaldeck Steel Decking, Metpark Car Parks, Metcon Concrete Floors and Access Flooring, Raised Floor Solutions can provide clients with a total structural flooring solution.
Kingspan Multideck and Kingspan Access Floor products are the most widely specified steel flooring systems within the UK and all steel floor deck products are CE marked in accordance with BS EN 1090-1 to execution class 4.
Raised Floor Solutions and its decking division, Metaldeck, is the first UK steel decking contractor to achieve CE marking for the design and procurement of composite steel floor decking. This, in combination with the use of the latest BIM (Building Information Modelling) software, sets the company apart from its competitors.
Raised Floor Solutions offers a full in-house design service backed by the latest Kingspan design software and professional indemnity insurance.
Early project involvement allows the company to value engineer the steel deck, concrete floor slab and access flooring elements to establish the most efficient design solution.
Working in partnership with Clients, Architects and Structural Engineers, Raised Floor Solutions technical team can advise on the most viable steel composite flooring solution to realise end user requirements by supplying CAD drawings and products to an ISO 9001 Quality Management Standard.
Teams of directly employed fully accredited operatives work throughout the UK to install all products to the highest quality standards and within the contract programme timescales.
Raised Floor Solutions is committed to running a safe and sustainable business that does not impact adversely on the environment in which it operates, and that supports the health and well being of its employees.
For more information please visit the Raised Floor Solutions website.
Featured articles and news
Classroom electrician courses a 'waste of money'
Say experts from the Electrical Contractors’ Association.
Wellbeing in Buildings TG 10/2025
BSRIA topic guide updates.
With brief background and WELL v2™.
From studies, to books to a new project, with founder Emma Walshaw.
Types of drawings for building design
Still one of the most popular articles the A-Z of drawings.
Who, or What Does the Building Safety Act Apply To?
From compliance to competence in brief.
The remarkable story of a Highland architect.
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.