Unfinished buildings
List of unfinished buildings ( taken from http://www.unfinishedbuildings.org/ by Rick Edmondson)
- Siena Cathedral, Italy, where it all started
- Bangkok, Thailand
- Bay-Adelaide Centre, Toronto, Canada
- Beauvais Cathedral, Beauvais, France
- Bolton Priory tower, Bolton Abbey, West Yorkshire, UK
- Cathedral of Saint John the Divine, New York, USA
- Ministerie van Tewerkskelling en Arbeid, Bruges, Belgium
- The Duomo, Florence, Italy
- Freemasons Hall, Central London, UK
- Gereja Ayam, Magelang, Central Java, Indonesia.
- Liverpool Metropolitan Cathedral, Liverpool, UK
- Longwood antebellum house, Natchez, Mississippi, USA
- Maida Vale Underground Station, London, UK
- Navrongo city centre, Ghana
- Norwich City Hall, Norfolk, UK
- Old Royal Naval College, Greenwich, London, UK
- Olimpijka unfinished bridge near Baranow, Masovia, Poland
- Palacio Legislativo Federal, Mexico City, Mexico
- Regatta Quays, Ipswich, Suffolk, UK
- Ryugyong Hotel, Pyongyang, North Korea
- Sagrada Familia, Barcelona, Spain
- Szkieletor, Kraków, Poland
- Wickham's Department Store, Mile End Road, London's East End, UK
- Wonderland Theme Park, Beijing, China
- Woodchester Park Mansion, Stroud, Gloucester, UK
A further unfinished builidng is the Tower of David, Venezuela. Featured in the Homeland TV Series, USA version. - https://en.wikipedia.org/wiki/Centro_Financiero_Confinanzas
Featured articles and news
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.