User contributions
- 13:46, 15 January 2013 (diff | hist) User:Nicky nguyen 91 (top)
- 16:46, 14 December 2012 (diff | hist) m Resonant column method (Protected "The resonant column method" ([edit=author] (indefinite) [move=author] (indefinite)))
- 16:45, 14 December 2012 (diff | hist) Resonant column method
- 16:32, 14 December 2012 (diff | hist) Resonant column method
- 16:30, 14 December 2012 (diff | hist) Resonant column method
- 16:26, 14 December 2012 (diff | hist) Off-site prefabrication of buildings: A guide to connection choices
- 16:25, 14 December 2012 (diff | hist) Resonant column method
- 16:23, 14 December 2012 (diff | hist) Resonant column method
- 16:13, 14 December 2012 (diff | hist) Resonant column method
- 16:10, 14 December 2012 (diff | hist) N File:Eq3.45.JPG (top)
- 16:09, 14 December 2012 (diff | hist) N File:Eq3.41.JPG (top)
- 16:06, 14 December 2012 (diff | hist) N File:Eq3.40.JPG (top)
- 16:00, 14 December 2012 (diff | hist) Resonant column method
- 15:59, 14 December 2012 (diff | hist) N File:Eq3.39.JPG (top)
- 15:58, 14 December 2012 (diff | hist) N File:Eq3.30.JPG (top)
- 15:56, 14 December 2012 (diff | hist) N File:Eq3.29.JPG (top)
- 15:48, 14 December 2012 (diff | hist) Resonant column method
- 15:47, 14 December 2012 (diff | hist) N File:Eq3.25.JPG (top)
- 15:46, 14 December 2012 (diff | hist) N File:Eq3.20.JPG (top)
- 15:45, 14 December 2012 (diff | hist) N File:Eq3.14.JPG (top)
- 15:44, 14 December 2012 (diff | hist) N File:Eq3.9.JPG (top)
- 15:42, 14 December 2012 (diff | hist) N File:Eq 3.8.JPG (top)
- 15:40, 14 December 2012 (diff | hist) N File:Eq 3.4.JPG (top)
- 15:39, 14 December 2012 (diff | hist) File:Eq 3.3.JPG (uploaded a new version of "File:Eq 3.3.JPG") (top)
- 15:38, 14 December 2012 (diff | hist) N File:Eq 3.3.JPG
- 15:36, 14 December 2012 (diff | hist) N File:Eq [IP address hidden].JPG (top)
- 15:31, 14 December 2012 (diff | hist) Resonant column method
- 15:30, 14 December 2012 (diff | hist) N File:Farghaly model.JPG (top)
- 15:27, 14 December 2012 (diff | hist) N File:K.JPG (top)
- 15:24, 14 December 2012 (diff | hist) N File:Bruch and mitchel.JPG (top)
- 15:24, 14 December 2012 (diff | hist) N File:Eq3.JPG (top)
- 15:21, 14 December 2012 (diff | hist) N File:Resonant column.JPG (top)
- 15:17, 14 December 2012 (diff | hist) N File:Eq2.JPG (top)
- 15:14, 14 December 2012 (diff | hist) N File:Coil.JPG (top)
- 15:13, 14 December 2012 (diff | hist) N File:Schematic view.JPG (top)
- 15:08, 14 December 2012 (diff | hist) N File:Eq1.JPG (top)
- 02:19, 14 December 2012 (diff | hist) Resonant column method
- 02:17, 14 December 2012 (diff | hist) Resonant column method
- 02:15, 14 December 2012 (diff | hist) N Resonant column method (Created page with " = Introduction = == Background == The resonant column method was initially developed by Japanese engineers: Ishimoto & Iida (1937). It was made popular in the 1960s by author...")
- 01:26, 14 December 2012 (diff | hist) m Off-site prefabrication of buildings: A guide to connection choices
- 01:14, 14 December 2012 (diff | hist) Off-site prefabrication of buildings: A guide to connection choices
- 01:13, 14 December 2012 (diff | hist) Off-site prefabrication of buildings: A guide to connection choices
- 01:03, 14 December 2012 (diff | hist) Off-site prefabrication of buildings: A guide to connection choices
- 01:00, 14 December 2012 (diff | hist) N File:Concealed fixing.JPG (top)
- 00:58, 14 December 2012 (diff | hist) N File:Discussion-corbel 2.JPG (top)
- 00:36, 14 December 2012 (diff | hist) Off-site prefabrication of buildings: A guide to connection choices
- 00:00, 14 December 2012 (diff | hist) N File:Discussion-corbel.JPG (top)
- 23:58, 13 December 2012 (diff | hist) N File:Discussion - continuous beam.JPG (top)
- 23:54, 13 December 2012 (diff | hist) Off-site prefabrication of buildings: A guide to connection choices
- 23:47, 13 December 2012 (diff | hist) Off-site prefabrication of buildings: A guide to connection choices
- 23:46, 13 December 2012 (diff | hist) N File:Connectin classification.JPG (top)
- 23:29, 13 December 2012 (diff | hist) N File:Frame and deck construction.JPG (top)
- 23:23, 13 December 2012 (diff | hist) Off-site prefabrication of buildings: A guide to connection choices
- 23:21, 13 December 2012 (diff | hist) N File:Ronan point tower block.JPG (top)
- 23:19, 13 December 2012 (diff | hist) N File:Laings O Rourke precast factory.JPG (top)
- 22:51, 5 December 2012 (diff | hist) Off-site prefabrication of buildings: A guide to connection choices
- 22:46, 5 December 2012 (diff | hist) Off-site prefabrication of buildings: A guide to connection choices (Replaced content with " = <br/> = Category:Products_and_services Category:Project_types Category:Sustainability Category:Student_architect_essay_competition [[Category:Student_engi...")
- 22:23, 5 December 2012 (diff | hist) Off-site prefabrication of buildings: A guide to connection choices
- 22:21, 5 December 2012 (diff | hist) File:Table.jpg (uploaded a new version of "File:Table.jpg") (top)
- 22:18, 5 December 2012 (diff | hist) N File:Table.jpg
- 22:16, 5 December 2012 (diff | hist) N File:Wall and Column shoe connection 2.JPG (top)
- 22:14, 5 December 2012 (diff | hist) N File:Wall and Column shoe connection 1.JPG (top)
- 22:12, 5 December 2012 (diff | hist) N File:Continuous beam connection.JPG (top)
- 22:07, 5 December 2012 (diff | hist) File:Corbel connection real example.JPG (uploaded a new version of "File:Corbel connection real example.JPG") (top)
- 22:06, 5 December 2012 (diff | hist) N File:Corbel connection real example.JPG
- 22:02, 5 December 2012 (diff | hist) N File:Corbel connection.JPG (top)
- 22:00, 5 December 2012 (diff | hist) Off-site prefabrication of buildings: A guide to connection choices
- 21:52, 5 December 2012 (diff | hist) File:Precast connection.jpg (uploaded a new version of "File:Precast connection.jpg") (top)
- 21:49, 5 December 2012 (diff | hist) File:Precast connection.jpg (uploaded a new version of "File:Precast connection.jpg")
- 21:49, 5 December 2012 (diff | hist) N File:Precast connection.jpg
- 21:45, 5 December 2012 (diff | hist) N File:Hybrid construction.JPG (top)
- 21:39, 5 December 2012 (diff | hist) Off-site prefabrication of buildings: A guide to connection choices
- 21:37, 5 December 2012 (diff | hist) N File:Volumetric bathroom.JPG (top)
- 21:32, 5 December 2012 (diff | hist) N File:Volumetric construction.JPG (top)
- 21:30, 5 December 2012 (diff | hist) Off-site prefabrication of buildings: A guide to connection choices
- 21:25, 5 December 2012 (diff | hist) File:Single&Multi storey.JPG (uploaded a new version of "File:Single&Multi storey.JPG") (top)
- 21:23, 5 December 2012 (diff | hist) N File:Crosswall construction.JPG (top)
- 21:21, 5 December 2012 (diff | hist) File:Single&Multi storey.JPG (uploaded a new version of "File:Single&Multi storey.JPG")
- 21:19, 5 December 2012 (diff | hist) N File:Single&Multi storey.JPG
- 21:12, 5 December 2012 (diff | hist) N File:Diagram.jpg (top)
- 21:07, 5 December 2012 (diff | hist) N File:Single storey column.jpg (top)
- 21:04, 5 December 2012 (diff | hist) Off-site prefabrication of buildings: A guide to connection choices
- 20:52, 5 December 2012 (diff | hist) Off-site prefabrication of buildings: A guide to connection choices
- 20:43, 5 December 2012 (diff | hist) Off-site prefabrication of buildings: A guide to connection choices
- 18:46, 5 December 2012 (diff | hist) Off-site prefabrication of buildings: A guide to connection choices
- 18:35, 5 December 2012 (diff | hist) m Off-site prefabrication of buildings: A guide to connection choices
- 18:24, 5 December 2012 (diff | hist) N File:Ronan point tower block failure.png (top)
- 18:20, 5 December 2012 (diff | hist) N File:Ronan point tower block failure.jpg (top)
- 18:12, 5 December 2012 (diff | hist) N File:Laing O Rourke precast factory.jpg (top)
- 18:06, 5 December 2012 (diff | hist) m Off-site prefabrication of buildings: A guide to connection choices (Protected "Off-site prefabrication of buildings: A guide to connection choices": For competition only ([edit=author] (indefinite) [move=author] (indefinite)))
- 18:05, 5 December 2012 (diff | hist) Off-site prefabrication of buildings: A guide to connection choices
- 17:52, 5 December 2012 (diff | hist) N Off-site prefabrication of buildings: A guide to connection choices (Created page with " Category:Products_and_services Category:Project_types Category:Sustainability Category:Student_architect_essay_competition [[Category:Student_engineer_essay_com...")
- 04:13, 12 November 2012 (diff | hist) m User:Nicky nguyen 91 (Protected "User:Nicky nguyen 91" ([edit=author] (indefinite) [move=author] (indefinite)))
- 04:12, 12 November 2012 (diff | hist) Nm User:Nicky nguyen 91 (Created page with " <br/>'''NGOC NGUYEN QUANG''' International Halls, Lansdowne Terrace, London, WC1N 1AS Mobile number: +447546101961 Email: [mailto:[email protected] nicky_nguyen_91...")
Featured articles and news
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
The ECA Industry Awards 2024 now open !
Recognising the best in the electrotechnical industry.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
BSRIA Building Reg's guidance: The second staircase
An overview focusing on aspects which most affect the building services industry.
Design codes and pattern books
Harmonious proportions and golden sections.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding..