CDM planning period
CDM planning period refers to the specific timeframe during which the Construction (Design and Management) Regulations (CDM) planning and preparation activities take place for a construction project. The CDM regulations are a set of health and safety regulations that apply to construction projects in the United Kingdom. The planning period is a crucial phase where key considerations and actions are taken to ensure the project is executed safely and effectively. Here are some key aspects of the CDM planning period:
1. Pre-construction Phase: The planning period typically occurs during the pre-construction phase of a project. It starts as early as the initial design stages and continues until construction work begins on site.
2. Appointing the Principal Designer and Principal Contractor: During the planning period, the client must appoint a Principal Designer and a Principal Contractor. The Principal Designer is responsible for coordinating health and safety aspects during the design phase, while the Principal Contractor takes charge of health and safety during the construction phase.
3. Assessing and Managing Risks: Risk assessments and risk management activities are conducted during the planning period. Hazards and risks associated with the project are identified, evaluated, and appropriate control measures are put in place to mitigate them.
4. Health and Safety Plan: A health and safety plan is developed during the planning period. This plan outlines how health and safety will be managed throughout the project, including measures to protect workers, visitors, and the general public.
5. Cooperation and Communication: Effective cooperation and communication among all parties involved in the project are established during the planning period. This includes ensuring collaboration between the client, designers, contractors, and any other stakeholders to ensure a coordinated and safe approach to the project.
6. Information Exchange: Relevant health and safety information is shared during the planning period. Designers provide information on the design and construction requirements to ensure health and safety considerations are incorporated from the start.
7. Competence Assessment: Competence assessments are carried out during the planning period to ensure that all individuals involved in the project have the necessary skills, knowledge, and experience to perform their roles safely.
8. Documenting the CDM Plan: The outcomes of the planning period, including risk assessments, health and safety plans, and other relevant documents, are compiled into a CDM plan. This plan serves as a reference and guide for the project's health and safety management.
It's important to note that the specific duration of the CDM planning period can vary depending on the size, complexity, and nature of the construction project. The planning period should be given adequate time and attention to ensure that health and safety considerations are properly addressed and integrated into the project's execution.
You must sign in or register to edit or comment on an article
Return to Talk:CDM planning period.
Featured articles and news
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.
Biodiversity and the built environment digital series
The nature of building, with CIOB and CWP.
A call for prevention and sensitive re-use.
Risks to the long-term effectiveness of the BNG scheme
National Audit Office publish review of Biodiversity Net Gain.
The CIAT principal designer register
Providing assurance and verification of the capability and competence of registered ATs.
Building Safety recommendations and Northern Ireland
The NI roadmap to improving safety in high rise residential.
Specifying rendered external wall insulation for fire safety
How to interrogate the evidence provided to the specifier.
The benefits of writing articles for your organisation
How to create a profile for your organisation and publish for free.
No Falls Week. The importance of safe working at height
What to expect and what is on offer to avoid accidents.
Scottish Government action to reach net-zero targets
Retrofit expert group highlight critical actions needed.
A forward thinking, inclusive global community of members.
From engineered product life-spans, to their extension.
Circular economy in the built environment
A brief description from 2021. Where are we now?
CLC publishes domestic retrofit competency framework
Roadmap of Skills for net zero.
Understanding is key to conservation.
Open industry engagement survey seeks responses
Institutions and the importance of engagement.