Contingency theory in construction
Contingency theory, also known as the contingency approach, is a management theory that is applicable to various industries, including construction. In the context of construction, contingency theory suggests that there is no one-size-fits-all approach to managing projects. Instead, the most effective management style and strategies depend on various factors or contingencies.
Here's how contingency theory is relevant in construction:
1. **Project Complexity:** The complexity of a construction project is a key contingency factor. More complex projects may require a more adaptive and flexible management approach, with an emphasis on collaboration, communication, and problem-solving among team members.
2. **Project Size and Scope:** The size and scope of a construction project can impact the management approach. Large-scale projects may necessitate a more structured and formal management style, while smaller projects may be more manageable with a less formal approach.
3. **Technology and Innovation:** The level of technology and innovation used in construction can influence project management. Projects utilizing advanced technology may require specialized training and coordination, affecting how the project is managed.
4. **Project Stakeholders:** The number and diversity of stakeholders involved in a construction project can influence the management approach. Effective communication and stakeholder engagement become vital in addressing their unique needs and concerns.
5. **Regulatory and Legal Environment:** The regulatory and legal environment in which a construction project takes place can shape the management decisions and strategies. Compliance with building codes, safety regulations, and environmental laws may dictate specific management actions.
6. **Resource Availability:** The availability of resources, including financial, human, and material resources, can impact project management decisions. Managing resource constraints effectively is crucial in completing projects on time and within budget.
7. **Project Risk Profile:** The level of uncertainty and risk associated with a construction project can influence management decisions and the need for contingency plans. Projects with higher risk profiles may require a more adaptive and proactive management approach.
8. **Project Objectives:** The specific objectives of a construction project, such as time, cost, quality, and sustainability goals, can affect management strategies. Balancing these objectives may require different management approaches.
In summary, contingency theory recognizes that the management of construction projects must be tailored to suit the unique circumstances and contingencies of each project. Flexibility, adaptability, and the ability to adjust management strategies based on changing circumstances are essential in effectively navigating the complexities of construction projects. Project managers and construction teams must carefully assess the various contingencies and make informed decisions to ensure successful project outcomes.
You must sign in or register to edit or comment on an article
Return to Talk:Contingency theory in construction.
Featured articles and news
Home builders call for suspension of Building Safety Levy
HBF with over 100 home builders write to the Chancellor.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
CIOB Apprentice of the Year 2024/2025
CIOB names James Monk a quantity surveyor from Cambridge as the winner.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
Treasury responds to sector submission on Warm Homes
Trade associations call on Government to make good on manifesto pledge for the upgrading of 5 million homes.
A tour through Robotic Installation Systems for Elevators, Innovation Labs, MetaCore and PORT tech.
A dynamic brand built for impact stitched into BSRIA’s building fabric.
BS 9991:2024 and the recently published CLC advisory note
Fire safety in the design, management and use of residential buildings. Code of practice.
NBS launches industry guide for specification writing
Available for free and as immediate download.
Peter Barber’s work revives forgotten building types.
Insights of how to attract more young people to construction
Results from CIOB survey of 16-24 year olds and parents.
Focussing on the practical implementation of electrification.
Preston flood scheme completes primary school SuDS
Three primary schools benefit from SuDS schemes.
Sustainable Urban Drainage and Biodiversity
Awards for champions of these interconnected fields now open.
Microcosm of biodiversity in balconies and containers
Minor design adaptations for considerable biodiversity benefit.
CIOB student competitive construction challenge Ireland
Inspiring a new wave of Irish construction professionals.
Challenges of the net zero transition in Scotland
Skills shortage and ageing workforce hampering Scottish transition to net zero.
Private rental sector, living standards and fuel poverty
Report from the NRH in partnership with Impact on Urban Health.
.Cold chain condensing units market update
Tracking the evolution of commercial refrigeration unit markets.