The CESMM3 is Civil Engineering Standard Method of Measurement, third edition. The document is intended to be used along with the conditions of the contract. It is also related to the works in civil engineering and simple building works.
The CESMM3 does not involve the calculation of bill of quantities related to large mechanical and electrical engineering works or building works that are complex. That are projects that are not frequent in the civil construction field.When such large project is being encountered, it has to be specially mentioned and described in the bill of quantities, so that tenders may be priced adequately and follows the method of measurement that is stated in the preamble to the bill of quantities.
[edit]
You must sign in or register to edit or comment on an article
Return to Talk:CESMM3.
Featured articles and news
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building 2024 judges choice winner
Once Upon a Pass by Liam Man.
CIOB Art of Building 2024 public choice winner
Fresco School by Roman Robroek.
HE expands finance alliance to boost SME house building
Project follows on from Habiko public-private place making pension partnership for affordable housing delivery.
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
How orchards can influence planning and development.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.