CDM planning period
CDM planning period refers to the specific timeframe during which the Construction (Design and Management) Regulations (CDM) planning and preparation activities take place for a construction project. The CDM regulations are a set of health and safety regulations that apply to construction projects in the United Kingdom. The planning period is a crucial phase where key considerations and actions are taken to ensure the project is executed safely and effectively. Here are some key aspects of the CDM planning period:
1. Pre-construction Phase: The planning period typically occurs during the pre-construction phase of a project. It starts as early as the initial design stages and continues until construction work begins on site.
2. Appointing the Principal Designer and Principal Contractor: During the planning period, the client must appoint a Principal Designer and a Principal Contractor. The Principal Designer is responsible for coordinating health and safety aspects during the design phase, while the Principal Contractor takes charge of health and safety during the construction phase.
3. Assessing and Managing Risks: Risk assessments and risk management activities are conducted during the planning period. Hazards and risks associated with the project are identified, evaluated, and appropriate control measures are put in place to mitigate them.
4. Health and Safety Plan: A health and safety plan is developed during the planning period. This plan outlines how health and safety will be managed throughout the project, including measures to protect workers, visitors, and the general public.
5. Cooperation and Communication: Effective cooperation and communication among all parties involved in the project are established during the planning period. This includes ensuring collaboration between the client, designers, contractors, and any other stakeholders to ensure a coordinated and safe approach to the project.
6. Information Exchange: Relevant health and safety information is shared during the planning period. Designers provide information on the design and construction requirements to ensure health and safety considerations are incorporated from the start.
7. Competence Assessment: Competence assessments are carried out during the planning period to ensure that all individuals involved in the project have the necessary skills, knowledge, and experience to perform their roles safely.
8. Documenting the CDM Plan: The outcomes of the planning period, including risk assessments, health and safety plans, and other relevant documents, are compiled into a CDM plan. This plan serves as a reference and guide for the project's health and safety management.
It's important to note that the specific duration of the CDM planning period can vary depending on the size, complexity, and nature of the construction project. The planning period should be given adequate time and attention to ensure that health and safety considerations are properly addressed and integrated into the project's execution.
You must sign in or register to edit or comment on an article
Return to Talk:CDM planning period.
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.