CDM planning period
CDM planning period refers to the specific timeframe during which the Construction (Design and Management) Regulations (CDM) planning and preparation activities take place for a construction project. The CDM regulations are a set of health and safety regulations that apply to construction projects in the United Kingdom. The planning period is a crucial phase where key considerations and actions are taken to ensure the project is executed safely and effectively. Here are some key aspects of the CDM planning period:
1. Pre-construction Phase: The planning period typically occurs during the pre-construction phase of a project. It starts as early as the initial design stages and continues until construction work begins on site.
2. Appointing the Principal Designer and Principal Contractor: During the planning period, the client must appoint a Principal Designer and a Principal Contractor. The Principal Designer is responsible for coordinating health and safety aspects during the design phase, while the Principal Contractor takes charge of health and safety during the construction phase.
3. Assessing and Managing Risks: Risk assessments and risk management activities are conducted during the planning period. Hazards and risks associated with the project are identified, evaluated, and appropriate control measures are put in place to mitigate them.
4. Health and Safety Plan: A health and safety plan is developed during the planning period. This plan outlines how health and safety will be managed throughout the project, including measures to protect workers, visitors, and the general public.
5. Cooperation and Communication: Effective cooperation and communication among all parties involved in the project are established during the planning period. This includes ensuring collaboration between the client, designers, contractors, and any other stakeholders to ensure a coordinated and safe approach to the project.
6. Information Exchange: Relevant health and safety information is shared during the planning period. Designers provide information on the design and construction requirements to ensure health and safety considerations are incorporated from the start.
7. Competence Assessment: Competence assessments are carried out during the planning period to ensure that all individuals involved in the project have the necessary skills, knowledge, and experience to perform their roles safely.
8. Documenting the CDM Plan: The outcomes of the planning period, including risk assessments, health and safety plans, and other relevant documents, are compiled into a CDM plan. This plan serves as a reference and guide for the project's health and safety management.
It's important to note that the specific duration of the CDM planning period can vary depending on the size, complexity, and nature of the construction project. The planning period should be given adequate time and attention to ensure that health and safety considerations are properly addressed and integrated into the project's execution.
You must sign in or register to edit or comment on an article
Return to Talk:CDM planning period.
Featured articles and news
Open industry engagement survey seeks responses
Institutions and the importance of engagement.
National Retrofit Hub unveils new guide
Digital Building Logbooks and Retrofit: An Introduction.
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.