CDM planning period
CDM planning period refers to the specific timeframe during which the Construction (Design and Management) Regulations (CDM) planning and preparation activities take place for a construction project. The CDM regulations are a set of health and safety regulations that apply to construction projects in the United Kingdom. The planning period is a crucial phase where key considerations and actions are taken to ensure the project is executed safely and effectively. Here are some key aspects of the CDM planning period:
1. Pre-construction Phase: The planning period typically occurs during the pre-construction phase of a project. It starts as early as the initial design stages and continues until construction work begins on site.
2. Appointing the Principal Designer and Principal Contractor: During the planning period, the client must appoint a Principal Designer and a Principal Contractor. The Principal Designer is responsible for coordinating health and safety aspects during the design phase, while the Principal Contractor takes charge of health and safety during the construction phase.
3. Assessing and Managing Risks: Risk assessments and risk management activities are conducted during the planning period. Hazards and risks associated with the project are identified, evaluated, and appropriate control measures are put in place to mitigate them.
4. Health and Safety Plan: A health and safety plan is developed during the planning period. This plan outlines how health and safety will be managed throughout the project, including measures to protect workers, visitors, and the general public.
5. Cooperation and Communication: Effective cooperation and communication among all parties involved in the project are established during the planning period. This includes ensuring collaboration between the client, designers, contractors, and any other stakeholders to ensure a coordinated and safe approach to the project.
6. Information Exchange: Relevant health and safety information is shared during the planning period. Designers provide information on the design and construction requirements to ensure health and safety considerations are incorporated from the start.
7. Competence Assessment: Competence assessments are carried out during the planning period to ensure that all individuals involved in the project have the necessary skills, knowledge, and experience to perform their roles safely.
8. Documenting the CDM Plan: The outcomes of the planning period, including risk assessments, health and safety plans, and other relevant documents, are compiled into a CDM plan. This plan serves as a reference and guide for the project's health and safety management.
It's important to note that the specific duration of the CDM planning period can vary depending on the size, complexity, and nature of the construction project. The planning period should be given adequate time and attention to ensure that health and safety considerations are properly addressed and integrated into the project's execution.
You must sign in or register to edit or comment on an article
Return to Talk:CDM planning period.
Featured articles and news
One of the most impressive Victorian architects. Book review.
RTPI leader to become new CIOB Chief Executive Officer
Dr Victoria Hills MRTPI, FICE to take over after Caroline Gumble’s departure.
Social and affordable housing, a long term plan for delivery
The “Delivering a Decade of Renewal for Social and Affordable Housing” strategy sets out future path.
A change to adoptive architecture
Effects of global weather warming on architectural detailing, material choice and human interaction.
The proposed publicly owned and backed subsidiary of Homes England, to facilitate new homes.
How big is the problem and what can we do to mitigate the effects?
Overheating guidance and tools for building designers
A number of cool guides to help with the heat.
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.