Dispute resolution
Possibly worth adressing substantially in this article as a core issue towards reducing the likelyhood of disputes arising is what would be at the source of the factors listed in the article existing in the first place as significant concerns to address. The list mentions "Properly assessing risks" while it should possibly actually say "Properly managing risks". At the source of most disputes features prominently project sponsors and/or participants to manage project risks primarily by transfer to others and by systematic converstion of the nature of risks into financial terms. Unintelligent/unreasonable risk transfers (downloading the responsibility to manage risks to entities that can not materially nor be reeasonably expeected to exercize the level of control and authority commensurate to the nature and/or importance of any given risk) is often the direct reason why the means to reduce disputes listed in the article fail to be implemented or even provided for. Managing risks by essentially evacuating them by transfer is a fundamentally delusional strategy. Transferring risks mostly produces downstream risk transfer chains, certain to fail at the weakest link. In fact, wholesale transfer of project risks merely creates a new risk, often cruelly underestimated in terms of probability and impact if at all actually assessed : failure of the risk transfer strategy. Failures in risk transfer strategy (including where everything is converteed into financial compensaiton) always occur after harm has been done to the project and damages incurred and, predictably, disputes having been triggered.
You must sign in or register to edit or comment on an article
Return to Talk:Dispute resolution.
Featured articles and news
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.
BSRIA Occupant Wellbeing survey BOW
Occupant satisfaction and wellbeing tool inc. physical environment, indoor facilities, functionality and accessibility.