Construction site records and registers
To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.
Construction site records and registers are important documentation tools used to record and track various aspects of a construction project. They serve as a means of communication, evidence of compliance, and reference for future use. Here are some common types of construction site records and registers:
1. Daily Construction Log: This log is maintained on a daily basis and records activities, weather conditions, workforce attendance, equipment used, and any significant events or incidents that occur on the construction site.
2. Material Receiving Register: This register tracks the receipt of construction materials on the site. It includes details such as the date of delivery, supplier information, quantity received, and any discrepancies or issues observed.
3. Inspection and Test Records: These records document the inspections, tests, and quality checks conducted during various stages of construction. They may include records for concrete testing, soil testing, structural inspections, electrical inspections, and more.
4. Workforce Attendance Register: This register records the attendance of workers on the construction site. It helps track the number of workers present, their working hours, and any leave or absences.
5. Site Safety Records: These records focus on documenting safety-related activities and incidents. They may include records of safety meetings, safety inspections, accident reports, near-miss incidents, and safety training conducted on-site.
6. Change Order Log: This log tracks any changes or modifications made to the original construction plans or scope of work. It includes details such as the date of change, reason for change, parties involved, and impact on cost or schedule.
7. Equipment Maintenance Log: This log records the maintenance and servicing of construction equipment and machinery. It helps track the maintenance schedule, repairs, and any issues observed.
It's important to note that the specific records and registers maintained on a construction site may vary depending on the project requirements, local regulations, and the policies of the construction company or project owner.
Thanks, that seems to be more of an article than a comment, feel free to create a new article under a related title..
If you did not write the comment or article yourself though, please to list a reference or source who did. Thanks.
You must sign in or register to edit or comment on an article
Return to Talk:Construction site records and registers.
Featured articles and news
Awe-inspiring medieval great barns.
Registered building inspectors
Building types and conflicts of interest updates explaineed.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.