As-built drawings and record drawings
To contribute to this discussion click 'Add a comment' above and add your thoughts to this page.
Apart from registering on site changes to the engineers' and architect's drawings it is essential that the specialist trade contractors reflect what has been installed on site.
Records of underfloor cabling in city offices is a particular problem because successive tenants cut off but leave in their predecessors cables and providing space is available install their own systems. Without cabling records this can prove a nightmare for say the fourth company to occupy the premises.
There is an issue relating to the method or convention for recording site changes during construction. The issue is that site changes need to be highlighted or made to stand out in order to identify them. This article mentions use of red ink to signify changes, but this is no use when the architectural drawing is a mass or various lines of various colours.
There needs to be a standard way of highlighting changes or revisions on a drawing and it must be easily understood and obvious.
When applying for an amendment of a building warrant it is necessary to show revisions when submitting drawings for local authority approval. These amended drawings should clearly show what has changed from the original approved drawings. This means that as-built drawings alone are not sufficient, unless it is easy to tell what is different from the original approved drawings. The original drawings have presumably already been assessed and approved, so all that needs to be checked is what has changed to ensure the design is acceptable.
You must sign in or register to edit or comment on an article
Return to Talk:As-built drawings and record drawings.
Featured articles and news
RTPI leader to become new CIOB Chief Executive Officer
Dr Victoria Hills MRTPI, FICE to take over after Caroline Gumble’s departure.
Social and affordable housing, a long term plan for delivery
The “Delivering a Decade of Renewal for Social and Affordable Housing” strategy sets out future path.
A change to adoptive architecture
Effects of global weather warming on architectural detailing, material choice and human interaction.
The proposed publicly owned and backed subsidiary of Homes England, to facilitate new homes.
How big is the problem and what can we do to mitigate the effects?
Overheating guidance and tools for building designers
A number of cool guides to help with the heat.
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.
Construction Skills Mission Board launch sector drive
Newly formed government and industry collaboration set strategy for recruiting an additional 100,000 construction workers a year.
New Architects Code comes into effect in September 2025
ARB Architects Code of Conduct and Practice available with ongoing consultation regarding guidance.
Welsh Skills Body (Medr) launches ambitious plan
The new skills body brings together funding and regulation of tertiary education and research for the devolved nation.
Paul Gandy FCIOB announced as next CIOB President
Former Tilbury Douglas CEO takes helm.
UK Infrastructure: A 10 Year Strategy. In brief with reactions
With the National Infrastructure and Service Transformation Authority (NISTA).