Bill of quantities BOQ
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.
Is it mandatory to attach the BOQ in all service and maintenance tender. And where is the different between BOQ and measured term contract (MTC) or schedule of rate.
Nothing is mandatory, it is up to the employer to decide whether a BoQ is required.
A BoQ is prepared by the employer's cost consultant and sets out measured quantities of all the items of work identified by the drawings and specifications in the tender documentation.
A schedule of rates is just a list of hourly rates that a contractor can use to price cost reimbursable works.
A measured term contract is a contract based on a schedule of rates that can be used for a regular programme of works such as maintenance work.
What is the difference between the Bill of Quantities and the Schedule of Works, please?
see associated articles list 'Schedule of work for construction'
Here is an example of a Final Bill of Quantities (FBQ) for plumbing work done by a term contractor in Singapore:
(http://gg.gg/final-bill-of-quantities)
You must sign in or register to edit or comment on an article
Return to Talk:Bill of quantities BOQ.
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.