Lifts and Escalators: A Quality Perspective
What if the onsite shaft dimensions as not as proposed by the architect in consultation with the lift supplier. For e.g. Proposed Dimensions are 1950mm*2400mm and onsite dimensions are 1950mm*2288mm. What can be done in that case??
In response to the above question:
This depends on the shaft type - is this concrete or steel / boarded?
First point is to determine the lift car size - how much clearance is there between the lift car and the shaft walls?
In the event this is a concrete shaft then this can become a significant issue as there is typically no secondary steelwork (to which the combination brackets / guides are fixed) so the ability to adjust these brackets is limited as they are fixed directly to the concrete. This will depend on the amount of clearance between the shaft walls and the lift car - is there sufficient space to install a compliant redesigned bracket?
For steel / boarded type shafts typically there is a secondary steelwork detail that is fixed to the steels within the shaft bridging the gap to the lift car/counterweight guide brackets. In this instance then a consultation with the secondary steelwork designer / installer to adjust the design to maintain the same lift car size could usually be quite easy to do (cost / programme impact aside)
In the worse case then the lift car size will need to adjusted to suit the reduced shaft size.
In my experience the lift supplier will not take 'handover' of the shaft if it doesn't meet the required dimensions.
You must sign in or register to edit or comment on an article
Featured articles and news
Latest Build UK Building Safety Regime explainer published
Key elements in one short, now updated document.
UKGBC launch the UK Climate Resilience Roadmap
First guidance of its kind on direct climate impacts for the built environment and how it can adapt.
CLC Health, Safety and Wellbeing Strategy 2025
Launched by the Minister for Industry to look at fatalities on site, improving mental health and other issues.
One of the most impressive Victorian architects. Book review.
Common Assessment Standard now with building safety
New CAS update now includes mandatory building safety questions.
RTPI leader to become new CIOB Chief Executive Officer
Dr Victoria Hills MRTPI, FICE to take over after Caroline Gumble’s departure.
Social and affordable housing, a long term plan for delivery
The “Delivering a Decade of Renewal for Social and Affordable Housing” strategy sets out future path.
A change to adoptive architecture
Effects of global weather warming on architectural detailing, material choice and human interaction.
The proposed publicly owned and backed subsidiary of Homes England, to facilitate new homes.
How big is the problem and what can we do to mitigate the effects?
Overheating guidance and tools for building designers
A number of cool guides to help with the heat.
The UK's Modern Industrial Strategy: A 10 year plan
Previous consultation criticism, current key elements and general support with some persisting reservations.
Building Safety Regulator reforms
New roles, new staff and a new fast track service pave the way for a single construction regulator.
Architectural Technologist CPDs and Communications
CIAT CPD… and how you can do it!
Cooling centres and cool spaces
Managing extreme heat in cities by directing the public to places for heat stress relief and water sources.
Winter gardens: A brief history and warm variations
Extending the season with glass in different forms and terms.
Restoring Great Yarmouth's Winter Gardens
Transforming one of the least sustainable constructions imaginable.