Guide to good practice in the management of time in major projects: Dynamic time modelling
Delayed completion affects all project based industries in all countries, and the bigger the project, the more damage delayed completion causes to costs, reputation and even to the survival of the contracting parties themselves.
First published by the Chartered Institute of Building (CIOB) in 2010, the 'Guide to good practice in the management of time in major projects' sets a standard for time management in building and civil engineering projects. It is an integral part of the CIOB’s strategy to provide standards, education, training and accreditation in time management.
The latest (2nd) edition, published in February 2018, emphasises dynamic, strategic time modelling for the management of time and cost on major projects. It includes a new chapter distinguishing the principal features of the dynamic time model and its development throughout the life of a project, from inception to completion. It also includes new appendices covering matters such as complexity in construction and engineering projects, productivity guides and a number of case studies.
Keith Pickavance, author and past President of the CIOB said:
“On major projects the failure strategically to manage time so often proves disastrous, not just for the contractor but also for the client, its consultants, and for the rest of the supply chain.
“This guide is a step-by-step illustration of how the parties can work collaboratively to meet this challenge using traditional project procurement routes or the most advanced BIM, from the adoption of a workable time-management strategy through to the day to day detail of risk management, using a predictive time model.”
The publication is aimed at project and program management professionals working in civil engineering and construction projects, including those from contractors, clients and project management consultants.
For more information and to purchase this latest publication, visit Wiley.
--CIOB
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Mental Health Awareness Week with ABS
Architects Benevolent Society programme of activity.
CLC publishes domestic retrofit competency framework
Roadmap of Skills for net zero.
May 13-19: Moving more for our mental health.
Understanding is key to conservation.
Open industry engagement survey seeks responses
Institutions and the importance of engagement.
National Retrofit Hub unveils new guide
Digital Building Logbooks and Retrofit: An Introduction.
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.