NRM1
The New Rules of Measurement (NRM) are published by the Royal Institution of Chartered Surveyors (RICS) and prepared by the Quantity Surveying and Construction Professional Group. They provide a standard set of measurement rules for estimating, cost planning, procurement and whole-life costing for construction projects. Adopting a standard methodology such as NRM facilitates consistency and benchmarking and helps avoid disputes.
NRM is a suite of documents, comprising three volumes:
- NRM1: Order of cost estimating and cost planning for capital building works.
- NRM2: Detailed measurement for building works (replacing the Standard Method of Measurement, seventh edition SMM7).
- NRM 3: Order of cost estimating and cost planning for building maintenance works.
NRM1 was first published in February 2009 as the RICS new rules of measurement: Order of cost estimating and elemental cost planning. A second edition was published in 2012, renamed RICS new rules of measurement: Order of cost estimating and cost planning for capital building works. It was renamed to better distinguish between capital building works and building maintenance works. Amongst other changes, the arrangement of elements was also revised. The second edition became operative on 1 January 2013.
NRM2 was published in April 2012. It became operative on 1 January 2013 and formally replaced the Standard Method of Measurement, seventh edition (SMM7) on 1 July 2013.
NRM3 was published in March 2014.
NRM 1 is a best practice guidance note offering guidance on the preparation of:
- Order of cost estimates.
- Elemental cost models.
- Cost plans.
- Cost analyses.
- Benchmark analyses.
- Capturing historical cost data for order of cost estimates and elemental cost plans.
- How to describe and quantify items not included in measurable building work items, such as; preliminaries, overheads and profit, consultant fees, risk allowances, inflation, and so on.
NRM1 comprises four parts:
- Part 1 sets out the context and definitions.
- Part 2 explains how to prepare an order of cost estimate.
- Part 3 explains how to prepare an elemental cost plan.
- Part 4 provides tabulated rules of measurement for the preparation of cost plans.
NB The New Rules of Measurement are accompanied by the 'Black Book', the QS and construction standards. Together they provide a suite of tools to help the construction industry work more collaboratively and consistently.
[edit] Related articles on Designing Buildings
- Benchmarking.
- Black book.
- Comparison of SMM7 with NRM2.
- Cost plans.
- Elemental cost plan.
- Measurement.
- NRM.
- NRM2.
- NRM3.
- Standard Method of Measurement (SMM7).
[edit] External references
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
Comments
Where can I borrow, view, buy this from? No link?
http://www.rics.org/uk/shop/NRM-1-Order-of-Cost-Estimating-and-Cost-Planning-for-Capital-Building-19143.aspx