Lands Chamber
Contents |
[edit] Introduction
The Lands Chamber is one of four chambers within the Upper Tribunal, part of the UK’s administrative justice system. It was formerly the Lands Tribunal, created by the Lands Tribunal Act 1949, but its functions were transferred to the Upper Tribunal in 2009.
The Upper Tribunal was set up to provide a common means for handling appeals against the decisions of lower tribunals. As such it has equivalent status to the High Court, allowing it to set precedents and enforce decisions. It is the only tribunal to have the power of judicial review.
The Lands Chamber is independent and decides on land disputes, as well as appeals from:
- Valuation tribunals.
- Leasehold valuation tribunals.
- Residential property tribunals.
[edit] Applying
It is possible to apply to the tribunal if the case is about:
- Compensation for the compulsory purchase of land.
- Discharge or modification of land affected by a restrictive covenant.
- Compensation for land affected by public works.
- A tree preservation order.
- Compensation for damage to land caused by subsidence from mining.
- Valuation of land or buildings for capital gains tax or inheritance tax purposes.
- Rights to light disputes.
- Compensation for property blight.
However, opting for a mediation service could be quicker and cheaper than applying for the tribunal.
[edit] Appealing
It is possible to appeal to the Lands Chamber if it is believed there was a legal problem with the decision of the tribunals or the First-tier Tribunal (Property Chamber). However, permission must be given by the original tribunal before an appeal is possible (unless the case is about a rates decision made by the valuation tribunal in England or Wales).
The instructions for appealing are contained in the decision letter. A request for permission must be received by the original tribunal within 28 days of the decision letter.
An appeal should include:
- A copy of the decision being appealed.
- A brief summary of what the case is about.
- Whether the party appealing wishes to attend the appeal hearing.
- Whether any expert witnesses are to be called.
- ‘Statement of case’, i.e. why the decision is being appealed.
- Any other documents required.
The Chamber than decides whether to consider the case, and usually will ask the applicant to attend a hearing. Hearings are generally held in public and, depending on the size of the claim, can cost between £275 and £16,500. If the case is won, the chamber may order the other party to pay the hearing costs.
A decision is issued in writing, usually within 3 months of the hearing.
If it is believed there was a legal problem with the decision at the Lands Chamber, it may be possible to appeal to a higher court. If the Chamber judge refuses permission, the applicant can take their appeal request to the Court of Appeal in England and Wales.
[edit] Decisions database
There is a decisions database available to search and find out the reasons why previous decisions have been made by the Chamber.
[edit] Related articles on Designing Buildings Wiki
- Civil procedure rules.
- Court settlement process.
- Disputes.
- European Court of Human Rights.
- Litigation.
- Mediation.
- Planning permission.
- Property blight.
- Property Chamber First tier Tribunal FTT.
- Restrictive covenant.
- Rights to light.
- Technology and Construction Court.
[edit] External resources
- Gov.uk - Upper Tribunal lands
Featured articles and news
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
The ECA Industry Awards 2024 now open !
Recognising the best in the electrotechnical industry.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
BSRIA Building Reg's guidance: The second staircase
An overview focusing on aspects which most affect the building services industry.
Design codes and pattern books
Harmonious proportions and golden sections.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding..