Walkover survey
A walkover survey is a basic site survey which can form part of the early site investigation process at the beginning of a project. It involves walking over the site and the surrounding area and recording any observed information which may be relevant to the project. It may be part a wider desk-based study of the site.
A walkover survey should highlight any immediately apparent geological, ecological, topographical or other issues which may present constraints to the project, such as; the presence of protected species, contamination, site obstructions, access problems, water sources, trees, site boundaries and so on. It may incorporate additional information gathered from local authorities, local residents and people who work in the vicinity of the site. It should identify any areas where further and potentially more detailed surveys may be necessary.
Wherever possible, any information prepared or obtained should be in a format which can be readily shared and used, and should be stored and named in a way consistent with the long-term project and operational needs.
A walkover survey will generally be followed by more specific site surveys.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
UK Construction Week, London is here !
Debuting major international pavilions and much more.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.