Self-build home: Occupy the home and rectify any defects
A meeting should be held to formally handover the completed site for occupation. Keys should be handed over, along with as-built drawings, certificates, warranties and so on.
A procedure should be agreed for reporting any defects.
The defects liability period (or rectification period) is a period set out in construction contracts (often 6 months) during which contractors are still bound by the terms of the contract and can be instructed to make good any defects that become apparent in the works.
The self builder should:
- Keep detailed notes about any defects that appear.
- Decide whether defects are design deficiencies or construction defects.
- Notify the responsible party and arrange access for inspection and rectification.
- At the end of the defects liability period, prepare a schedule listing defects that have not yet been rectified and agree with the contractor the date by which they will be rectified. The contractor must in any event rectify defects within a 'reasonable' time.
- Ensure that all outstanding warranties, instructions and other paperwork has been received.
- Finalise any outstanding party wall matters.
- Arrange final inspections of the works and if satisfied issue a certificate of making good defects.
- Agree the final account.
- Issue the final certificate and make the final payment.
If you have ideas for how to improve this plan, you can make changes yourself, just by clicking 'Edit this article', you can add ideas to the discussion page, you can submit a comment to us, or you can email [email protected].
Featured articles and news
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
Comments
Thank you very much for this, much appreciated.