3D printed bridge
In Spain, the first pedestrian bridge printed in 3D in the world (3DBRIDGE) was inaugurated 14th of December of 2016 in the urban park of Castilla-La Mancha in Alcobendas, Madrid.
The 3DBUILD technology used was developed by ACCIONA, who was in charge of the structural design, material development and manufacturing of 3D printed elements. The bridge has a total length of 12 m and a width of 1.75 m, and was printed in micro-reinforced concrete.
Architectural design was done by Institute of Advanced Architecture of Catalonia (IAAC). The 3D printer used to build the footbridge was manufactured by D-Shape.
The 3D printed bridge was developed through parametric design, which allows the optimisation of material distribution and minimises the amount of waste by recycling the raw material during manufacture. The computational design also allows the structural performance to be maximised, thanks to the application of generative algorithms and challenging the traditional techniques of construction.
The project, led by ACCIONA, was developed by a multidisciplinary team of architects, mechanical engineers, structural engineers and representatives of the municipal administration, among them Enrico Dini, an expert inventor in large-scale 3D manufacturing and IAAC collaborator.
Content and images courtesy of IAAC.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.
Comments
The bridge is certainly horrible