Building safety case
A reformed building safety regulatory system, Government response to the ‘Building a Safer Future’ consultation, Ministry of Housing, Communities and Local Government, April 2020 suggests that a building safety case is: ‘A structured argument, supported by a body of evidence that provides a compelling, comprehensible, evidenced and valid case as to how the Accountable Person is proactively managing and controlling fire and structural risks.’
Where the accountable person is: ‘The duty-holder during a building’s occupation.’
And duty-holders are: ‘The key roles (whether fulfilled by individuals or organisations) that are assigned specific responsibilities at particular phases of the building life cycle.’
'The safety case should refer to the totality of the building safety information and include all supporting evidence identifying how fire and structural risks are being managed – this information should be stored in the golden thread. The safety case report should contain an introduction which indicates how the fire and structural risks in a building are being managed by the Building Safety Manager. This should be followed by a written explanation and justification of the approach being taken to manage risks, referencing the supporting evidence in the safety case.'
Under the proposals set out in the consultation, the building safety case will be submitted to the buildings safety regulator by the accountable person and maintained by the building safety manager.
The process of preparing the safety case will involve:
- Identifying hazards.
- Deciding who might be harmed and how.
- Evaluating the risks associated with these hazards.
- Deciding on the necessary control and mitigation measures.
- Recording those findings and implementing them.
- Evaluating and monitoring on an ongoing basis.
The Explanatory Notes to the Draft Building Safety Bill, published by the Ministry of Housing, Communities & Local Government on 20 July 2020, defines a Safety Case Report as: 'A structured argument, supported by a body of evidence that provides a compelling, comprehensible, evidenced and valid case as to how the Accountable Person is proactively managing fire and structural risks in order to prevent a major incident and limit the consequences to people in and around the building.'
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
UK Construction Week, London is here !
Debuting major international pavilions and much more.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.