Surface water run-off
Surface water run-off is: 'Water flow over the surface of roofs and ground surface to a drainage system. Ground surface run-off occurs if the ground is impermeable, is saturated or if the rainfall is particularly intense.'
Volume of run-off is: 'The volume of run-off that is generated by rainfall occurring on the site. This is typically measured in cubic metres. Additional predicted volume of run-off is the difference between the volumes of run-off; pre-development, greenfield and post development.'
Ref Home Quality Mark One, Technical Manual SD239, England, Scotland & Wales, published by BRE in 2018.
NB Run-off coefficient is a measure of the amount of rainfall that is converted to run off.
A recurrence interval is: ‘The average time between runoff events that have a certain flow rate, for example, a flow of 2 m/s might have a recurrence interval of two years.’ Ref The SuDS Manual (C753) published by CIRIA in 2015.
Climate Change 2021, The Physical Science Basis, published by the Intergovernmental Panel on Climate Change in 2021, defines runoff as: ‘The flow of water over the surface or through the subsurface, which typically originates from the part of liquid precipitation and/or snow/ice melt that does not evaporate, transpire or refreeze, and returns to water bodies.’
[edit] Related articles on Designing Buildings
Featured articles and news
Open industry engagement survey seeks responses
Institutions and the importance of engagement.
National Retrofit Hub unveils new guide
Digital Building Logbooks and Retrofit: An Introduction.
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.