Procure to pay
The Chartered Institute of Procurement & Supply (CIPS) Glossary of procurement terms, defines procure to pay (P2P) as: ‘The process of requisitioning, purchasing, receiving, paying for, and accounting for goods and services.’
For more information to: Procure to pay software.
[edit] Related articles on Designing Buildings Wiki
- Key performance indicators.
- Milestones.
- Non-performance.
- Performance bond.
- Performance gap.
- Performance in use of completed buildings.
- Performance specification.
- Performance specified work.
- Performance.
- Procurement.
- Procure to pay software.
- Post occupancy evaluation.
- Strategic performance targets.
- Suspension of performance.
Featured articles and news
Open industry engagement survey seeks responses
Institutions and the importance of engagement.
National Retrofit Hub unveils new guide
Digital Building Logbooks and Retrofit: An Introduction.
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.