Suppliers for design and construction
In the construction industry, ‘supplier’ (or economic operator) is a very general term which refers to organisations contracted as part of the delivery of a built asset.
Traditionally, suppliers might have been considered to be organisations contracted to provide physical supplies such as goods, materials, plant, and so on, however, its use is now much broader and PAS 1192-2 (now replaced by BS EN ISO 19650) defines a supplier as any ‘…provider of services or goods either directly to the employer or to another supplier in a supply chain’. The 'supply chain' is the interconnected hierarchy of suppliers.
As construction has become more complex, and suppliers have become more specialist, so the supply chain has extended. On a straight-forward 'traditional' building project, design consultants and the main contractor, sometimes referred to as tier 1 suppliers, work for the employer, and the main contractor may have a limited chain of their own suppliers.
However, on PFI or design and build projects, there may be just one first tier, or principal supplier, with wide range of consultants, sub-consultants, and sub-contractors working for them. The situation becomes more complicated on large projects when the employer has several tier 1 suppliers, all with extended supply chains. This may cascade down to a plethora of suppliers sometimes unknown to management at the top of the chain.
One of the difficulties encountered in the construction industry is that the first and second tier of the supply chain often sign-up to fairly onerous contract conditions but as the chain develops, so the contractual liabilities decrease until suppliers at the end of the chain may not be ‘locked in’ at all.
BIS Research paper No. 145, Supply Chain Analysis into the Construction Industry, A Report for the Construction Industrial Strategy, published by the Department for Business Innovation and Skills in October 2013 assessed five projects ranging in value from £1 million to £25 million.
The report suggests that, ‘Tier 1 contractors are typically termed main contractors, and many tier 2 contractors are described as specialist contractors. Labour-only sub-contractors typically operate at the third tier.’
It found that it was not uncommon to have 50 to 70 tier 2 suppliers and sub-contractors and suggested that the, ‘…duplication of multiple layers of profit, overhead and risk could represent a source of non-value added cost and waste.’
In recent years, larger employers offering continuity in construction have taken an increasing interest in establishing relationships beyond direct, first tier suppliers. Framework contracts and partnering agreements have pioneered this approach, encouraging the involvement of selected suppliers at relatively early stages of projects while offering continuity of work. This has led to greater collaboration between lead designers, contractors, specialist designers and specialist suppliers.
[edit] Related articles on Designing Buildings
- Code for Construction Product Information CCPI.
- Contractor vs supplier.
- Critical service contracts.
- Critical suppliers.
- Fragmentation of the UK construction industry.
- Indirect supplies.
- Integrated supply team.
- Key suppliers.
- Main contractor.
- Manufacturer.
- Named specialist work.
- Nominated supplier.
- Novation.
- PAS 1192-2.
- Partnering.
- Point of supply.
- Products v goods v materials.
- Public sector dependent suppliers.
- Reserved contract.
- Service provider.
- Spark framework RM6094.
- Subcontractor.
- Supply.
- Supply chain integration.
- Supply chain management.
- Tier.
- Tier 1 suppliers.
- Tier 2 and tier 3 suppliers
- Types of contractor.
- VAT reverse charge.
[edit] External references
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.