Alternative escape route
Approved document B, Fire Safety, Volume 2, Buildings other than dwellinghouses (2019 edition), defines alternative escape routes as:
Escape routes that are sufficiently separated by direction and space or by fire resisting construction to ensure that one is still available if the other is affected by fire. Note: A second stair, balcony or flat roof which enables a person to reach a place free from danger from dire is considered an alternative escape route for the purposes of a dwellinghouse. |
An alternative exit is one of two or more exits, each of which is separate from the other.
NB The Scottish Building Standards, Part I. Technical Handbook β Domestic, Appendix A Defined Terms, defines an alternative exit as: ββ¦an exit from a dwelling which is through a door other than its main entrance door and is available for use at all times.β
[edit] Related articles on Designing Buildings Wiki
- Building evacuation.
- Escape route.
- Evacuating vulnerable and dependent people from buildings in an emergency FB 52.
- Exit passageway.
- Fire door.
- Firefighting route.
- Means of escape.
- Protected escape route.
- Protected stairway.
- Storey exit.
- Unprotected escape route.
- Vomitory.
- Width of doors stairs and escape routes.
Featured articles and news
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
UK Construction Week, London is here !
Debuting major international pavilions and much more.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.