Algarve House, Southwark
U + I Group transform areas of towns and cities into thriving communities and neighbourhoods.
Algarve House is a 1 acre site that includes the space above and adjacent to Southwark Tube station in South London. U+I Group are working in a joint venture partnership with Transport for London (TfL) on a landmark new mixed-use project that will regenerate this gateway location on Blackfriar's Road.
U+I and TfL will undergo an extensive consultation process with Southwark Council, local businesses, residents and the wider community as the masterplan for the site, designed by architects AHMM, is developed. The regeneration plans will pay particular attention to the existing local environments, such as the popular pedestrianised Isabella Street which runs along the back of the development site.
U+I have opened Platform, a creative arts venue, in what was formerly a derelict office building in the middle of the site. Platform is a new multi-discipline project space with a mission to encourage and promote groundbreaking art, music and performance.
Project data:
- Date acquired: 2013
- Architect: Coffey Architects
- Development partners: TfL
--U and I
[edit] Related articles on Designing Buildings Wiki:
- Articles by U and I.
- Blackhorse Road regeneration.
- Cathedral Group.
- Circus Street, Brighton.
- Clapham One.
- Cockpit Yard.
- Development Securities.
- Joint venture.
- Landmark Court, Southwark.
- Mixed-use development.
- Placemaking.
- Regeneration.
- Skipton House project.
- The Deptford Project.
- The Movement, Greenwich.
- U and I.
- Westminster Industrial Estate, Charlton.
Featured articles and news
UK Construction Week, London is here !
Debuting major international pavilions and much more.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.