Waste electrical and electronic equipment WEEE
The European Environment Agency defines Waste electrical and electronic equipment or WEEE as
"electrical or electronic equipment (EEE) which is waste within the meaning of Article 1(a) of Directive 75/442/EEC, including all components, sub-assemblies and consumables, which are part of the product at the time of discarding . Council Directive 75/442/EEC of 15 July 1975 on waste: 'waste' means any substance or object which the holder disposes of or is required to dispose of pursuant to the provisions of national law in force."
This type of material will usually fall under the WEEE Directive. The WEEE Directive aims to contribute to sustainable production and consumption by;
- preventing the creation of WEEE as a first priority
- contributing to the efficient use of resources and the retrieval of secondary raw materials through re-use, recycling and other forms of recovery
- improving the environmental performance of everyone involved in the life cycle of EEE
In order to achieve these objectives, the Directive
- requires the separate collection and proper treatment of WEEE and sets targets for their collection as well as for their recovery and recycling
- helps European countries fight illegal waste exports more effectively by making it harder for exporters to disguise illegal shipments of WEEE
- reduces the administrative burden by calling for the harmonisation of national EEE registers and of the reporting format
The Waste Electric and Electronic Equipment (WEEE) Regulations 2013 became law in the UK on the 1st of January 2014 and replaced the 2006 Regulations. Those Regulations transposed the main provisions of Directive 2012/19/EU on WEEE which recast the previous Directive 2002/96/EC. The scope of the Regulations were extended in January 2019 to cover further categories of electric and electronic equipment (EEE).
[edit] Related articles on Designing Buildings
- Articles about electricity.
- Consumer electronics.
- Consumer unit.
- ECA articles.
- Electrical appliance.
- Electrical equipment.
- Electrical installation.
- Electrical safety.
- Electrical system.
- Electrical and electronic equipment
- End of life potential.
- Environmental impact assessment EIA.
- Environmental plan for building design and construction.
- Planned obsolescence.
- Plastic and recycling.
- Recycling explained.
- Types of plastic in construction.
- Waste and Resources Action Programme WRAP.
- Waste hierarchy.
- Waste management plan for England.
Featured articles and news
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
UK Construction Week, London is here !
Debuting major international pavilions and much more.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.