Direct costs for goods and services are those costs incurred directly for production and include items such as raw materials, labour, equipment, software and power costs. Direct costs can be traced and attributed to a cost ‘object’ which may be a product, department, cost centre or project.
Indirect costs (sometimes called ‘overheads’) are those necessary to keep a production facility in business and include rent, insurance, advertising and marketing which, although they may be included in the cost of the product or service, they are still indirect costs because they do not vary directly with the volume of goods/services produced and are not easily attributable to a particular process or project.
The amount added to a product’s unit costs by indirect costs will vary according to production levels, as in the following illustration:
The direct cost of manufacturing a steel padlock is £1, made up of:
The factory’s monthly indirect costs (rent, equipment, marketing etc) = £50,000
In January, the factory makes 100,000 padlocks, so the indirect cost element attributed to each unit is £0.50p.
In February, the factory makes 200,000 padlocks, so the indirect cost element attributed to each unit is £0.25p.
But in both months, the indirect costs have not changed, the only variable is in how much indirect cost is incurred by each unit.
So, indirect costs do not vary directly with production levels, whereas direct costs remain dependent on production levels and will vary when production is increased or decreased.
NB Cost prediction, Professional Statement, 1st edition, published in November 2020 by the Royal Institution of Chartered Surveyors (RICS), defines direct costs as: ‘Costs incurred on labour, material, plant and equipment, etc., i.e. costs that are directly accountable to the project.’
[edit] Related articles on Designing Buildings
Featured articles and news
Biodiversity net gain, tips and tools for small sites
How to deal with BNG when options become limited.
Registered building inspectors
Building types and conflicts of interest updates explained.
A brief run-down reminder of key points to note.
BSRIA's commitment to sustainability and net zero
Key documents that represent an early shift in thinking.
A resource for Cleaner Air, Better Tomorrow.
Awe-inspiring medieval great barns.
A history of timber construction in the UK
From a timber Stonehenge to half timber houses.
Engineering services still struggle with labour shortages
According to latest quarterly services survey of the sector.
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.