Plan, Do, Check, Act (PDCA)
Plan, Do, Check, Act (PDCA) is a model that is used to assist the control and continual improvement of processes and projects. It has been used in construction project management as a means of balancing the systems and behavioural aspects of management and health and safety. Its cyclic approach allows for the constant updating of health and safety measure ultimately leading to a safer working environment.
PDCA was popularised by W. Edwards Deming, a leading figure in modern quality control processes and procedures. Deming intended that PDCA should be used when developing a new or improved process, product or service; when implementing changes; when defining a repetitive work process, and so on.
It is made up of the following stages:
- Plan: Assess a current or new process and how improvements could be made.
- Do: Test small changes as part of a limited study to assess their effectiveness.
- Check: Gather and analyse the test results, compare them with the expected outcomes and identify what has been learnt.
- Act: Take action according to the lesson learned in the ‘Check’ step.
In some iterations of PDCA, the fourth step ‘Act’ is replaced with ‘Adjust’. This is often used when the PDCA process has been run several times and enough information has been accumulated for it to have been adopted as a new ‘standard’. ‘Adjust’ allows for continual monitoring of the process after changes have been made, with small improvements as and when appropriate, creating a cycle of continuous improvement.
[edit] Related articles on Designing Buildings
- Assurance and self-certification.
- CDM Regulations: a quality perspective.
- Contingency theory.
- Continuous improvement process.
- Design freeze: a quality perspective.
- Digital engineering.
- Game theory.
- Lean construction.
- Lean Six Sigma.
- Pareto analysis.
- Project execution plan.
- Project manager.
- Quality control.
- Quality Management System.
- Total quality management in construction.
- Transition time.
Featured articles and news
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.
Biodiversity and the built environment digital series
The nature of building, with CIOB and CWP.
A call for prevention and sensitive re-use.
Risks to the long-term effectiveness of the BNG scheme
National Audit Office publish review of Biodiversity Net Gain.
The CIAT principal designer register
Providing assurance and verification of the capability and competence of registered ATs.
Building Safety recommendations and Northern Ireland
The NI roadmap to improving safety in high rise residential.
Specifying rendered external wall insulation for fire safety
How to interrogate the evidence provided to the specifier.
The benefits of writing articles for your organisation
How to create a profile for your organisation and publish for free.
No Falls Week. The importance of safe working at height
What to expect and what is on offer to avoid accidents.
Scottish Government action to reach net-zero targets
Retrofit expert group highlight critical actions needed.
A forward thinking, inclusive global community of members.
From engineered product life-spans, to their extension.
Circular economy in the built environment
A brief description from 2021. Where are we now?
CLC publishes domestic retrofit competency framework
Roadmap of Skills for net zero.
Understanding is key to conservation.
Open industry engagement survey seeks responses
Institutions and the importance of engagement.
Comments
This doesn't seem have been developed for practical application in a construction environment.