How to write a method statement
Method statements are widely used in construction as a means of controlling specific health and safety risks that have been identified (perhaps following the preparation of a risk assessment), such as lifting operations, demolition or dismantling, working at height, installing equipment, the use of plant, and so on.
A method statement helps manage the work and ensures that the necessary precautions have been communicated to those involved. Method statements should be written by a competent person who is familiar with the process being described and may need to be agreed between the client, principal contractor and contractor.
The first stage involves examining the work activity or process in question in preparation for writing the statement about it. The potential hazards of the work should be identified, including anything that has the potential to cause ill health or harm to anyone involved.
There should then be an analysis of what has been done to mitigate against these risks and whether the mitigation measures are sufficient. The guide term ‘As Low As Reasonably Practicable’ (ALARP) should be followed, and if necessary, further safety measures adopted.
The method statement typically begins with a header which contains important information for site staff and clients. This can include:
- The title of the job.
- The site address.
- Company name, address, logo, contact details, etc.
- Start and end dates for the proposed work.
- Description of the work.
- Health and safety contacts.
- Issue date.
- Unique document number.
The method statement should then provide further details relating to the specific work activity. These tend to focus on the type of personal protective equipment (PPE) that will be used for site operatives, as well as any environmental or quality considerations that are of particular importance.
The next section of the method statement will typically provide details such as:
- First aid procedures.
- Staff training required.
- Work permits and other permissions required.
- Scaffolding and working platforms that may be required.
- Site access and egress.
- Materials that will be handled and how they will be stored.
- Construction plant to be used and shut-down procedures.
- Emergency procedures.
- How existing structures will be safeguarded.
The final section of a method statement should set out step-by-step instructions as to how the work activity should be safely carried out and completed.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
The ECA Industry Awards 2024 now open !
Recognising the best in the electrotechnical industry.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
BSRIA Building Reg's guidance: The second staircase
An overview focusing on aspects which most affect the building services industry.
Design codes and pattern books
Harmonious proportions and golden sections.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding..